【大成建設 新方式の床版更新技術】渋滞をギリギリまで減らす新たな工事

Taisei Corporation has developed a new type of half-section deck replacement machine and deck renewal technology for expressway renewal construction. This new, patented half-section deck replacement machine features independent hoisting and transport mechanisms, making it unclassified as a crane. The machine can be delivered, assembled, and dismantled and removed in just one day, and it features a wheeled, self-propelled system that eliminates the need for platforms or rails. A new joint method was also adopted to connect the newly constructed decks. This eliminates the need for reinforcement at deck joints along the bridge axis (the direction of vehicle travel), significantly improving workability. The strength of the filler mortar allows the road to be reopened in one day, shortening the construction cycle. The joints perpendicular to the bridge axis use a "head-bar joint" construction method that ensures fatigue durability equivalent to 100 years without the need for prestressing. As a result, construction time has been significantly shortened, significantly contributing to reducing traffic congestion caused by construction. In addition, the new technology has enabled us to open the facility completely on weekends (planned traffic opening), which means there are no restrictions on work zones due to construction on weekends, which has had the greatest effect in reducing congestion and contributing to reducing environmental issues (CO2).Furthermore, this has resulted in us being able to contribute to work style reforms in line with modern social conditions (8 days closed every 4 weeks).

【北海道新幹線工事】シールドトンネルの切羽(きりは)まで 【JR北海道】
▶︎

【北海道新幹線工事】シールドトンネルの切羽(きりは)まで 【JR北海道】

JR渋谷駅西口再開発工事、巨大クレーンSCX3500ブームが組み上がるまで。 2026/7/19
▶︎

JR渋谷駅西口再開発工事、巨大クレーンSCX3500ブームが組み上がるまで。 2026/7/19

【心震える】3万人に聞いた!感動工場ベスト10【愛知あたりまえ】
▶︎

【心震える】3万人に聞いた!感動工場ベスト10【愛知あたりまえ】

Yokohama Port Shin-Honmoku District Wharf (-18m) (Earthquake Resistant) Construction Project [Com...
▶︎

Yokohama Port Shin-Honmoku District Wharf (-18m) (Earthquake Resistant) Construction Project [Com...

Cherry Republic Glen Arbor Garden Cam
▶︎

Cherry Republic Glen Arbor Garden Cam

木と緑の「杜のスタジアム」国立競技場建設の記録|大成建設
▶︎

木と緑の「杜のスタジアム」国立競技場建設の記録|大成建設

世界最大トラック製造の真実!4M巨大タイヤ・積載600トン・340万ユーの驚異鉱山機械の製造プロセス
▶︎

世界最大トラック製造の真実!4M巨大タイヤ・積載600トン・340万ユーの驚異鉱山機械の製造プロセス

防災工事 ~防火水槽ができるまで~ 【三洋建設株式会社】
▶︎

防災工事 ~防火水槽ができるまで~ 【三洋建設株式会社】

[On-site coverage program] You're a witness to reverse climbing! A close look at the mast-pulling...
▶︎

[On-site coverage program] You're a witness to reverse climbing! A close look at the mast-pulling...

【仕事人】巨大橋建設の舞台ウラ  地上120mに橋をかけろ!天空のスゴ腕仕事人
▶︎

【仕事人】巨大橋建設の舞台ウラ 地上120mに橋をかけろ!天空のスゴ腕仕事人

Explore! The Linear Chuo Shinkansen: The latest infrastructure construction, bringing together cu...
▶︎

Explore! The Linear Chuo Shinkansen: The latest infrastructure construction, bringing together cu...

松の平工区災害復旧工事(メタルロード工法)1080
▶︎

松の平工区災害復旧工事(メタルロード工法)1080

岸壁をつくる。(東京国際ターミナル整備事業)/東洋建設株式会社(日本埋立浚渫協会関東支部)
▶︎

岸壁をつくる。(東京国際ターミナル整備事業)/東洋建設株式会社(日本埋立浚渫協会関東支部)

These Massive Factories Mass-Produce Thousands of Tons of Construction Concrete
▶︎

These Massive Factories Mass-Produce Thousands of Tons of Construction Concrete

設楽ダム転流工 / Shitara dam commutation work
▶︎

設楽ダム転流工 / Shitara dam commutation work

【大成建設】ボスポラス海峡横断鉄道トンネル~海底をわたる風~
▶︎

【大成建設】ボスポラス海峡横断鉄道トンネル~海底をわたる風~

The Birth of Japan's Fastest Bike: Suzuki HAYABUSA Manufacturing Process
▶︎

The Birth of Japan's Fastest Bike: Suzuki HAYABUSA Manufacturing Process

[Building the Bridge Foundation] Craftsmen at Work on Bridge Replacement #BridgeConstruction #Japan
▶︎

[Building the Bridge Foundation] Craftsmen at Work on Bridge Replacement #BridgeConstruction #Japan

希少なマシーンを使った大木の特殊伐採!【枯松】
▶︎

希少なマシーンを使った大木の特殊伐採!【枯松】

【密着】地上120mに橋をかけろ!天空のスゴ腕仕事人『every.特集』
▶︎

【密着】地上120mに橋をかけろ!天空のスゴ腕仕事人『every.特集』