RB30 Budget Build - Bottom end | PART 3

Join the Journey!!   / driftsquid     / driftsquid   The RB30 Budget Build Continues. On part 3 we explain the assembly side of things for the bottom end. The rods have been resized, rod bolts installed, crank bearings and crank gets installed. We cover a lot of information and there will have to be a PART 4 or 5 yet to come. So much awesome info in these videos. Big thanks to Darren from Lewis Engines for giving me his time and knowledge throughout this whole process. For any info about the parts he sells please visit his website here - http://bit.ly/LEWISENGINES Part 1 -    • RB30 Budget Build - Strip down | PART 1   Part 2 -    • RB30 Budget Build - Machining and Balancin...   Part 3 -    • RB30 Budget Build - Bottom end | PART 3   Part 4 -    • Video   This channel is all about my life. I Drift as much as I can and when i'm not drifting I'm in the Shed building, upgrading and doing what ever I can to get back out Drifting. Want to see more of my Sonvia, the 1000HP RBM3 or anything I get up to in my busy world. Then Please Subscribe here!    / @driftsquid   Become an exclusive Driftsquid Youtube Member to support the Journey -    / @driftsquid   My website http://bit.ly/DRIFTSQUID For business enquires please contact me via email [email protected] DriftSquid Clothing, stickers, hats, stubbies are all here http://bit.ly/DRIFTSQUID Instagram http://bit.ly/DSINSTAGRAM Facebook http://bit.ly/DSFACEBOOK Music from Epidemic Sound