The cliff on the left is already hanging and prone to landslides
The excavation of the cliff wall using an iron spear was carried out by Nurwanto to get sand even though the pile of sand to be filtered was quite a lot but it was still not enough to fill the sand load into the truck and two miners named Ahmad and Grandpa Diro cleaned the coral and also carried out the filtering process and it was also seen that the cliff wall dug by Nurwanto looked hanging and prone to landslides after Nurwanto had been digging the cliff wall for a long time, finally Nurwanto decided to carry out the filtering process with fellow miners #merapi slopes #sand cliffs #mengalitebing #pronetolandslides

▶︎
Morning Activities: Cleaning the Location Until It's Clean

▶︎
A massive landslide occurred, and the camera was buried along with everything else.

▶︎
Split Cross Candle Mount

▶︎
Press RUSHED OUT after Trump TOTAL MELTDOWN

▶︎
Top 6 Insane Factory Processes That Will Blow Your Mind

▶︎
You Have to Be Careful When Working

▶︎
Giant Drain Rescue Unclogging the Path for Water

▶︎
Top teamwork: tippers and track-dozers cover up a refuse-filled, wild-grass inundated valley.

▶︎
The Driver Always Helps the Sand Miners in Their Hard Work

▶︎
Cưa Cây Còng khủng Lồ, Tàn Um Tùm, Xung Quanh Nhà, Cưa Kỹ Thuật 496

▶︎
Rockman, the Cliff Destroyer

▶︎
Massive excavation‼️sand harvest on the cliff

▶︎
Milling a 2-Ton Giant Oak on a Portable Sawmill | No Loader – Just 2 Men and a Winch

▶︎
The Gobi Desert is too dangerous without this 🇲🇳 |S8, EP140

▶︎
Top 5 Huge Scale!Metal Melting Scrap & Recycling And Manufacturing Process & Mass Production Factory

▶︎
Incredible New Landfill PROJECT! 5Ton Dump Truck Unloading RockSoil & Dozer D20A Pushing Into Water

▶︎
Top Brilliant Recycling and Manufacturing Mass Production Factory Process Videos

▶︎
To Make The Cliff Safe, The Top Of The Cliff Was Slid Down

▶︎
Man Build a Secret UNDERGROUND BASE that Even the Scouts Couldn't Detect | Start to Finish

▶︎
