How to Create an AIR for Asset Information Requirements

A complete walkthrough of building an Asset Information Requirements (AIR) workflow following ISO 19650 - from creating the list of maintainable assets, to contracting with appointed parties, to verifying the models that come back, and producing a COBie-style handover report. Demonstrated end-to-end inside Plannerly's Scope and Verify modules. Timestamps: 0:00 Introduction - what AIR covers and why it matters 0:38 Quick tour of the Plannerly Scope module 1:53 Verify module preview - colour-coded model checking 3:08 Getting started - create a free Plannerly account 3:56 OIR - organizational information requirements 4:34 Why create the AIR as early as possible 5:28 Three ways to build the list - manual, BSDD, CSV 6:43 Creating assets manually with BSDD classification 8:18 Library of pre-built assets with graphics 9:11 Defining information requirements and verification rules 11:18 Importing assets and requirements from CSV 13:08 Tags for filtering and grouping 14:51 Assigning responsibilities to teams 16:39 Creating a work package 17:55 Exporting the agreement (PDF, Excel, IDS) 19:23 The e-signature workflow 22:00 Quality control - the Verify module 22:54 Linking elements to requirements (light fixtures example) 25:30 Model rules for automated linking 27:01 QA Fix workflow and team handover 28:30 COBie deliverable and handover report 30:14 Recap and conclusion Plannerly resources: