Rénovation studio 25m² : Début de la MEZZANINE | Ép. 4

After weeks of preparation, it's finally time to build the mezzanine structure! In this episode, we hoist a beam several meters long through the window, attach the first wall plates, and finally assemble the structure that will almost double the living space of this studio apartment. Thanks to FlexiSpot for their trust and for sponsoring this episode by providing the desk used in this video. ⚡️ FlexiSpot Prime Day 📅 From June 23rd at 10:00 AM to June 26th: promo codes for up to 50% off available, limited quantities (first come, first served)! https://go.flexispot.fr/ATELIER_ANT-d... 🔹 FlexiSpot E7 PLUS Desk 🏷️ - Up to €150 off! 🔥 https://go.flexispot.fr/ATELIER_ANT-e... #FlexiSpotFR As is often the case on a construction site, things don't always go exactly as planned... Between the brick joints, chemical anchors, and the installation of the main beam, this episode is probably the most technically challenging since the start of this renovation. If you enjoy this series, please subscribe, give it a thumbs up, and share the video—it helps the channel the most! 📸 **Instagram**:   / atelier__ant   🎥 **TikTok**: @atelier_ant Contact: [email protected] --- ⏱️ Chapters 00:00 Introduction 00:42 Window Replacement 01:30 Fixing My Big Mistake 03:52 FlexiSpot Collaboration 04:54 Mezzanine Assemblies 07:54 Lifting a Beam Through the Window 10:25 Wall Plate Installation 15:46 Beam and Bracket Preparation 16:57 Window Frame Repair and Plaster Touch-Ups 19:06 Preparing the Wood Pieces 20:10 Main Beam Installation 24:33 Angle Bracket Preparation and Installation 25:59 Conclusion 26:37 End #renovation #mezzanine #architecture #DIY #woodworking #construction #atelierANT #renovationstudio #wood