Fixing my "American" Highway & Expanding Pixeldale (CS2)

Pixeldale is undergoing its most ambitious transformation yet. After the new residential boom, jobs are in desperate demand. To save the shoreline for residents and fix my dodgy “American” motorway junction, the council made a drastic call: Total Reset. We bulldozed the old industrial heart, terraformed a massive 3-level staggered industrial park on the hills, rebuilt the main highway connection, relocated the gas plant + incinerator, and laid proper British-style roads with destination-first bike parking and pedestrian shortcuts. This is full infrastructure surgery — the TOTAL RESET Pixeldale needed. Inside the episode: The Great Relocation (gas plant & incinerator move) 3-Level Terrain Masterclass Fixing the “American” Motorway Mistake Bike Logic & Pedestrian Network Is this massive gamble going to bring Pixeldale into a prosperous future, or have we gone too ambitious? ► Next episode: The Maiden Journey of our new trains into the industrial heart! Timestamps: 00:00 - Welcome back to Pixeldale! 01:40 - The Big Masterplan 04:20 - Terraforming the 3-Level Hills 11:30 - Motorway Junction Total Rebuild 17:50 - Gas Plant & Power Relocation 23:10 - Roads, Bike Paths & Shortcuts 26:40 - Zoning New Industry + Final Thoughts What do you think of the new 3-level industrial zone? Too ambitious or spot on? Drop your thoughts below 👇 Like & Subscribe for more Pixeldale! #CitiesSkylines2 #CS2 #Pixeldale #TotalReset #UKRealism #IndustrialZone #TrafficFix #3LevelDesign