Whitehaven Harbour
Whitehaven Harbour is the the gateway to the lakes. Located on the North West coast of England, the Harbour is a safe haven with 400 marina berths. (Note its only been orange for last 2 years believed to be containated with iron ochre , Various agencies are looking to trace the source and find a way to solve the problem.) Anyway With the first quay being built in 1634, it was originally used for the export of salt and coal. With 80% of all Ireland’s coal being imported from Whitehaven by the 1700s. In 1876 the Queen’s Dock was built. This was a wet dock with one set of dock gates to hold the water in as the tide ebbed. The original wooden gates were replaced with steel gates in 1938 and can still be seen today. Access was greatly improved to the port by the installation of a £8.5 million Sea lock in 1998. One of the Sea lock’s main purpose is to protect the town of Whitehaven from tidal flooding, this having been a common occurrence prior to the installation. Since 1990, £20 million of grant funding has been invested in and around the harbour. This has greatly improved the public access and has also provided new employment opportunities with the construction of a state of the art boat repair shed. In recent years Whitehaven has hosted magnificent maritime festivals, bringing many people to the harbour and town. Orange water first started to enter Whitehaven Harbour in November 2022. The contaminated water is getting into Queens Dock through something called a culvert. A culvert is a tunnel or pipe that allows water to flow under things like roads and railways. In Queens Dock, the culvert is releasing water from Bransty Beck and a drainage system in Bransty railway tunnel. Bransty railway tunnel takes trains underground between Corkickle and Whitehaven. In recent years, this tunnel has started to flood. Tests have shown that the floodwater has iron ochre in it, which makes sense because the tunnel runs through areas where coal is found. As soon as the contaminated water began to arrive in the harbour, we started working with Whitehaven Marina Ltd, the Environment Agency, Network Rail, the then Coal Authority (now renamed the Mining Remediation Authority, as of November 2024), Cumberland Council and our local MP to test the water, find the source and look for a way to stop it.

William pit Whithaven Cumbria On the 75th Anniversary of the 1947 Disaster 15th August 1947.

Inside Britain’s Most Forgotten Seaside Town (It Has a Wild Past)

Westbay harbour dredge in Dorset #drone #broadchurch

This London Bus Drives Under the River Thames at EAST London… 😳🌊 | Bus 129 (4k HDR)

JUST MY DRONE // GREENOCK SCOTLAND

Trump-Drohungen: Kiesewetter fordert USA-De-Risking | Markus Lanz vom 08. Juli 2026

Worksop Spring Fair | Bracebridge Recreation Ground Worksop 28/03/2025

Heidi Reichinnek zur Regierungserklärung von Friedrich Merz | 09.07.26

Coast to Coast - Part 1: The Lakes

Whitehaven Marina

Whitehaven town centre February 2022

Awesome Boats At Whitehaven Harbour In Cumbria UK - 100 Golden Moments Caught On My Camera # 19

Haystacks & Fleetwith Pike | The Sacred Summit Walk

Update from Ukraine | Huge! Ukraine Liberates South! Russians Run! More Ships Lost

Exploring Wentworth Woodhouse Stately Home

Hello from Whitehaven Harbour in West Cumbria

Heidi Reichinnek spricht Merz direkt an - und dann passiert DAS...

Whitehaven Marina Cumbria🇬🇧

Wast Water – England’s Deepest & Most Dramatic Lake | Lake District Walk

