THE TRAINS MUST ROLL - PART TWO - Following Norfolk Southern Railroad's Tie & Surfacing Gang #8

We pickup exactly where we left off in Part One - following the fascinating work of Norfolk Southern Railroad's Tie and Surfacing Gang #8 as 67 men and 33 machines go about the task of replacing 7000 ties on the NS mainline in northeast Ohio. Every machine has a purpose, and every man has a mission. This is hard, dirty, and dangerous work, but absolutely essential to maintaining the backbone of the railroad - the track, timbers, and roadbed. The mission is critical, and failure is not an option, because come hell or high water - THE TRAINS MUST ROLL ! This is Part Two of a series, and the entire process will be covered exactly as it unfolds. Filmed on location in Alliance, Sebring, and Beloit, Ohio during June, 2024.

Norfolk Southern's R3 Dual Rail Gang replacing ribbon rail on the EC-line (Part 1) - 12/3/2020
▶︎

Norfolk Southern's R3 Dual Rail Gang replacing ribbon rail on the EC-line (Part 1) - 12/3/2020

Laying Welded Rail
▶︎

Laying Welded Rail

💪 12,000 tons of Coal ! Massive Mile Long 100 Car Coal Train Loading 😳
▶︎

💪 12,000 tons of Coal ! Massive Mile Long 100 Car Coal Train Loading 😳

Switzerland’s Historic Railway Giants Return 🚂🔥 | Bahnfestival Brugg 2026
▶︎

Switzerland’s Historic Railway Giants Return 🚂🔥 | Bahnfestival Brugg 2026

The most ridiculous worker fails caught on camera
▶︎

The most ridiculous worker fails caught on camera

How Millions Of Meters Of Train Rails Are Made From Steel - Railroad Tracks Mass Production Line
▶︎

How Millions Of Meters Of Train Rails Are Made From Steel - Railroad Tracks Mass Production Line

THE TRAINS MUST ROLL - The story of Norfolk Southern Railroad Tie & Surfacing Gang #8
▶︎

THE TRAINS MUST ROLL - The story of Norfolk Southern Railroad Tie & Surfacing Gang #8

Train Loading Efficiency : Two Dozers, 11,000 Tons, 100 Cars
▶︎

Train Loading Efficiency : Two Dozers, 11,000 Tons, 100 Cars

Flüssiges Roheisen auf der Eisenbahn - Torpedopfannen an der Saar
▶︎

Flüssiges Roheisen auf der Eisenbahn - Torpedopfannen an der Saar

UP Big Boy 4014 helps a stalled freight train in Blair Ne.
▶︎

UP Big Boy 4014 helps a stalled freight train in Blair Ne.

TRRS 547: Railroad Rail Replacement
▶︎

TRRS 547: Railroad Rail Replacement

TIE GANG IN ACTION ON THE UNION PACIFIC! ALL EQUIPMENT, CLOSE UPS, AND DRONE VIEWS, TRAIN TRAFFIC!
▶︎

TIE GANG IN ACTION ON THE UNION PACIFIC! ALL EQUIPMENT, CLOSE UPS, AND DRONE VIEWS, TRAIN TRAFFIC!

Jaw - Dropping Action! Loading a 100 car coal train - Fast and Efficient Operation. 🚂
▶︎

Jaw - Dropping Action! Loading a 100 car coal train - Fast and Efficient Operation. 🚂

How Train Tracks Are Manufactured – This is How Train Tracks Are Made - Tudo Tech HD Channel
▶︎

How Train Tracks Are Manufactured – This is How Train Tracks Are Made - Tudo Tech HD Channel

Extreme Train Railway Tracks Replacement Modern Technology - Amazing Rail Building Machines 2021
▶︎

Extreme Train Railway Tracks Replacement Modern Technology - Amazing Rail Building Machines 2021

Most Ridiculous Worker Mistakes Caught on Camera
▶︎

Most Ridiculous Worker Mistakes Caught on Camera

MG TOWER - A LOOK INSIDE BEFORE IT FALLS
▶︎

MG TOWER - A LOOK INSIDE BEFORE IT FALLS

How Train Wheel Is Made. Wheelset and bogies repair and maintenance process
▶︎

How Train Wheel Is Made. Wheelset and bogies repair and maintenance process

Heavy Loaded Coal Train STALLS on Hill, with Radio Communication, & gets Rescued by another train
▶︎

Heavy Loaded Coal Train STALLS on Hill, with Radio Communication, & gets Rescued by another train

2 foot gauge railway FIRST SWITCH
▶︎

2 foot gauge railway FIRST SWITCH