Clifton Rail Bridge Demolition, January 2026
The Clifton Rail Bridge which carries the West Coast Main Line over the M6 motorway near Penrith is demolished. This £60 million project replaced a 60-year-old, weight-restricted concrete bridge with a new 130-metre, 4,200-tonne steel structure designed to last over 120 years. The new bridge was constructed off-site and moved into place using self-propelled modular transporters, this can be seen at the end of the video. in this video you see the different stages preparing and then the demolition of the old bridge. some footage is sped up.

▶︎
New Mersey Ferry Royal Daffodil Starts Trials on the Mersey

▶︎
Evapco Evaporative Condenser Fan Test at 480 Volts (3-5-25)

▶︎
The Scale of EMR Alexandra Docks | NEPTUNIA Arrival, Torch Cutting & Material Handlers

▶︎
DB 232 241-0 mit Notfallkranzug am 07.06.26 in Bautzen

▶︎
Ninth Street Demolition (Part 4)

▶︎
30 Days To Build A Stunning Outdoor Staircase For A Forest Farm | Building Darm in Forest

▶︎
Worst Plane Landing Fails Caught on Camera

▶︎
Removing the second Church road Rail bridge

▶︎
TOP 20 Incredible Building Demolitions That Collapsed Giants in Seconds | Controlled Explosions

▶︎
Norwegen – Senegal Highlights | Gruppe I, FIFA WM 2026 | sportstudio

▶︎
TRU Colnebridge, Bradley. Bridge Replacement.

▶︎
Baustellen überall... Berlins marode Brücken | Reportage

▶︎
Ninth Street Demolition (Part 3: Steel)

▶︎
VN24 - Rotator too small - Heavy-duty cranes recover Big Rig in trouble - then disaster strikes...

▶︎
Streckenneuaufbau 8/16.6.2026

▶︎
Hamburg to Schwerin 🚂 | Freight Train Cab Ride | Siemens Vectron BR193 | Last Sunny Spring Day | 4K

▶︎
MASSIVE SHREDDER SWALLOWS CARS | CAR SHREDDING | S NORTON LIVERPOOL

▶︎
A428 Black Cat to Caxton Gibbet – Black Cat Roundabout - 21 June 2026

▶︎
This is How Stainless Steel Pipes Are Manufactured || Most Amazing Production of Pipes

▶︎
