Building $1 Billion of Runway at CLT International Airport
Disclaimer—this video is NOT produced by CLT. Welcome to Charlotte Douglas International Airport, one of the busiest in the United States. And like any other busy airport, it's growing FAST. And fast growth doesn't only mean new airport terminals—it means entirely new runways, like CLT's fourth parallel runway project. A multi-year $1B undertaking, the fourth parallel runway will eventually allow air traffic to flow in and out of the airport more efficiently. To build it, there's A LOT of earthmoving involved. And this is where ES Wagner comes into play. Moving dirt since 1947, they also moved the dirt for CLT's third parallel runway in the early 2000s. Now they're back, and we enjoyed checking out the action. To learn more about ES Wagner, check out their website here: https://www.eswagner.com/

Hauling the World's Biggest Mining Loader Across Australia!

How Concrete is Made!

How Hoover Dam Was Actually Built (Step by Step)

How to Delete Entire British Power Plants!

Inside UN Aviation: IL-76 Humanitarian Airdrop Mission

Historic Hurricane Damage Railroad Cleanup!

Inside Virginia’s $4 Billion Tunneling Megaproject!

WHY GERMANY IS SO GOOD IN LOGISTICS: Landing, unloading, loading – Cargo hub Leipzig | Documentary

Operating the World's Mightiest Earthmovers!

8 Months Building an Off Grid Home - On 50 Acre Farm

XXL-Fracht für die Beluga in Bremen I Abenteuer Flughafen (2/2) | Die Nordreportage | NDR Doku

Exploring the World's Largest Earthmoving Machines at BAUMA Munich 2025!

Paving a Remote Australian Airport Runway Overnight!

DHL A300 in the Cockpit: Flying Cargo Through the Night

Why is the US Army Building a $4B Reservoir to Save the Everglades?

What Went Wrong With California High Speed Rail

Inside Japan’s Giant Excavator Factory – UNSEEN Factory Tour!

This Is How The World's Strongest Anchor Chains Are Made | by @Satisfyingtech116

Why Frankfurt Airport Is Lufthansa's Biggest Weakness

