Glidewell Laboratories optimizes its production by 9 hours with cobots_Indonesian sub
Glidewell decided to try out a UR5 robot. It was easily programmed to pick a crown from the dispensers, place it in the milling lathe, pick it back out, and place it on a conveyor after the 10 minute milling cycle. By communicating with a vision camera, the robot was programmed to move on to a different shade if dispensers run out, ensuring fluent production. Overall, this dynamic, single part flow has cut the production-cycle time from 27 to 18 hours, saving two milling operators per shift. For more details: https://www.universal-robots.com/case...

▶︎
Explore glidewell.io™ with Jim Glidewell, CDT, Founder & President

▶︎
Getting To Know the Glidewell Removables Lab Operation

▶︎
Then another sign appeared in Heaven...a great red Dragon

▶︎
Meet the all-new UR15 · A sharper, faster, more agile cobot

▶︎
Chairside Live Episode 272: Explore Our Laboratory With Mr. Jim Glidewell

▶︎
How they did it: Why Canvas chose the Universal Robots platform

▶︎
Collaborative robot machine tending, deburring, grinding, re-grip, marking. @yaskawa Motoman HC20

▶︎
This Medical Machine costs $18,000. I Took It Personally.

▶︎
I Hacked This Temu Router. What I Found Should Be Illegal.

▶︎
Injection molding with collaborative robots realizes ROI in 1,500 hours

▶︎
Amazing Factory Produces MILLIONS of Padlocks | Incredible Manufacturing Process

▶︎
Electricity Meter Recycling to Recover Pure 24K Gold | Amazing Gold Recovery Process

▶︎
A Tour of Our Implant Manufacturing Facility with Jim Glidewell

▶︎
Incredibly flexible pick & place robot!

▶︎
COBOT WeldSpace 4.0: Cobot welding in shuttle operation

▶︎
Wolfgang Friebauer // Glidewell Laboratories

▶︎
The Augmented Laboratory: Digitizing for Safety and Success with Glidewell Intelligent Manufacturing

▶︎
My Golden Retriever Heals a Terrified Rescue Kitten in Just 3 Meetings!

▶︎
Stellantis deploys dozens of AMRs to optimize logistic flows

▶︎
