SAAKA SWAMP Crossing Project on Kaliro - Pallisa Road.
This 3.5km swamp crossing which connects Busoga to Teso has for long been a bottleneck on our network. We have since undertaken works to remedy the problem. The scope covered spans the 3.5km length and an additional 500m on each side of the swamp approach. This makes a total of 4.5km that will be tarmacked to protect the road asset.

▶︎
Saka Swamp & Bridge Project on Kaliro Pallisa Road- UNRA In-house Supervision- Sept 2023 Progress

▶︎
Princess Of Boogie Woogie Delights Everyone

▶︎
Saaka bridge reconstruction at 95%

▶︎
Everyone Ignored Him… Until He Played | GUITAR PRO pretended TO BE HOMELESS

▶︎
Saka Swamp Road Project on Pallisa Kaliro Road - 5 Minutes Video (March 2024)#uganda #construction

▶︎
PARLIAMENT SETTLES PALLISA-BUTEBO BORDER ISSUES

▶︎
Fearless Moroto Mayor confronts Updf Soldiers as Cattle rustlers appear in court

▶︎
Infrastructure for Tourism in Uganda

▶︎
Hospital renovation - Busolwe Hospital handover expected in April 2024

▶︎
The look of Masaka city 🇺🇬 in 2024 is unbelievable, it's worth a visit.

▶︎
FLOODS DESTROY ROAD: Kaliro - Namutumba road in bad shape, locals ask leaders to help

▶︎
Saka Swamp Project on Pallisa Kaliro Road by the UNRA In-House Construction Supervision Team.

▶︎
Hundreds on the verge of starvation as hunger hits Kaliro district

▶︎
EPISODE 5 - Infrastructure for Social Transformation

▶︎
The true faces of the Che

▶︎
EPISODE 4 - De-congesting the Cities through Improved Road Networks

▶︎
The Brooklyn Bridge Should Have Been Impossible in 1870

▶︎
Idiots with Fast Trucks: Heavy Equipment Fails | Extreme Oversized Truck Transport #25

▶︎
