
▶︎
Piping fitup kaise karte hai / pipe fitter / Big pipe fitup / golden joint/ SS pipe fiting kre

▶︎
Erection of long pipe with L-bow 40meters | part2 @ japurah samsung project.

▶︎
Erection of pipe spool | 10 meters @ jafurah samsung project

▶︎
ERECTION OF 16 TONS INSTRUMENT VALVE IN PR 6 | HUGRS PROJECT HOFUF.

▶︎
#construction PART 1 | TRABAHO NG RIGGER DITO SA PILIPINAS

▶︎
Center of Gravity

▶︎
PTC200-DS lifts 1,600 ton wash tower

▶︎
200 ton crane heavy lifting

▶︎
ERECTION OF 13 METERS LONG PIPE AT PR-2 | SAFANIYAH PROJECT MARCH|2023.

▶︎
Lifting Operation

▶︎
ERECTION OF INSTRUMENT VALVE PART1 | AT KUNG PAANO NARIN NILA PINATAYU.

▶︎
10"Gate valve 45° me areshan // Gate valve install / How it work/

▶︎
ERECTION OF PIPE SPOOL AT COLUMN VESSEL STRACTURE 9 | japurah samsung project

▶︎
Erection of valves | top of the vessel @ japura samsung project 2025.

▶︎
ERECTION OF PIPE SPOOL WITH ELBOW AT PR 2/1 MAY 2023 AT SAFANIYAH DBN.

▶︎
Bored Piling Works

▶︎
Vessel Erection

▶︎
PT. Rekayasa Industri - Video Erection (Heavy Lift & Super Heavy Lift)

▶︎
Pulling Marine Riser

▶︎
