Collett Transports 146Te Yankee Dryer to ICT UK’s New Deeside Facility
Collett has successfully delivered a 146-tonne Yankee Dryer to ICT UK’s new paper manufacturing plant in Deeside, utilising our 250Te girder bridge trailer and 6-axle SPMT. This project demonstrated our diverse service capabilities in heavy transport, route management, and installation, from vessel discharge at Ellesmere Port, road transport, on-site transhipment to final positioning on site. 🔗 To read the full project story, visit: https://www.collett.co.uk/yankee-dryer 👇 Learn more 👇 The operation began at Ellesmere Port, where Collett team discharged the 146Te Yankee Dryer from the vessel using an LTM1800D 750Te crane and loaded it onto our 250Te girder bridge trailer for onward transport. The convoy travelled under controlled night-time movements, including a full M53 motorway closure managed in coordination with National Highways and Cheshire Police. With a loaded height of 6.2m, overhead cable lifting was carried out in collaboration with SPEN and BT, while route adjustments were made to overcome height restrictions and tight turns. After an overnight stop at Cheshire Oaks, the load continued its journey to Deeside, escorted by Cheshire Police and supported by full traffic management. Upon arrival, the dryer was transhipped onto a 6-axle Self-Propelled Modular Transporter (SPMT) for on-site manoeuvring and positioned inside the new facility for installation. This project took 15 months from conceptualisation to realisation involving close coordination with SPEN, BT, National Highways, Cheshire Police and local councils to navigate and deliver the load safely and on time. 🎯 Project Highlights: • 146-tonne Yankee Dryer delivered and installed at ICT UK, Deeside • Full M53 motorway closure and police escort • Overhead cable lifting with SPEN and BT • Transported using 250Te girder bridge and 6-axle SPMT • Positioned on site for final installation • 15-month project from planning to completion 📚 Read more project stories: https://www.collett.co.uk/news

Collett Transport the Experts in Motion Triple heading a Transformer on 14 row & a Pusher truck

PSA Breakbulk Coil Terminal New coil handling equipment

Collett Moves Six 158 Tonne Engines Through Dublin in a Multi-Stage Transport Project

Yankee Dryer Design and Construction

SHIFTING BIG SHIT

Biggest Ship Collisions and Mistakes Caught on Camera

Transporting a 234 Tonne Stator: Journey from Heysham Port to Gretna Grid Stability Facility

Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #1 #adamrose #smartworkers

Collett Delivers North Kyle Wind Farm | 441 components. 10 months. One project.

Revealing The SPECIAL TECHNIQUE Of A Pakistani Man To EXTRACT GOLD From Used Motherboard Waste

Why Australia Is Spending $1.2B to Pave Its Most Dangerous Road

9 bridge parts from Nordhausen to Münster - Universal Transport

Beach Landing & Transport of Electrical Transformer in Porthmadog, Wales

Watch This 300,000-Ton Ship Disappear | The Final Moments of a Stellar Banner long version HD

Unbelievable Workers | Working with Talented Engineers #55 #construction #workers #smart #adamrose

Drama Tersulit & Gila‼️Truk Eropa Muatan 100 Ton Disiksa Total Dan Kandas di Tanjakan Sitinjau Lauik

TANKS ENGINE COLD START AND REVS (Abrams, Leopard, King Tiger....)

The 27 Million Pound Big Muskie Is Still Rotting In Ohio After Tearing The Earth Apart

Never Buy a Water Pump Again! A 65-Year-Old Plumber Made His Own Water Pump Using PVC Pipes | Update

