Natural sequence farming pick up point from flow line.

Here's a shout video on our realignment of a pick up point from a flow line into NSF contours on either side. A level bankless contour which allows for management of flows, while allowing for excess to go straight ahead down the original flow path. This flow line was dry 11 years ago, & our Natural Sequence Farming works have reinstated the wetlands higher up, & this keeps the gully flowing 24/7/365. The contour we're managing water into is 2.4 kilometres long...not 2.4 metres as I state in the video!