Terna's National Control Center: present, past and future
Leveraging technology and innovation to serve the Italian electricity system. Let’s take a look inside the rooms where the flows of energy across the entire transmission grid are managed in real time. At our National Control Centre (CNC), which was refurbished in 2024, more than 60 years after its opening, Terna’s professionals perform the critical task of dispatching. They ensure a constant balance between the supply and demand of electricity throughout the country. This story began a long time ago.

▶︎
NEXT GEN INVENTION SHOCKED ENGINEERS

▶︎
Presentation Day - IV edizione Master Tyrrhenian Lab @univca

▶︎
The Grid Doesn't Need More Power Plants (It Needs This)

▶︎
Charging the Future: Behind the Grid | Episode 4: From Today to Tomorrow

▶︎
Armed Forces Week webinar

▶︎
Powering The Internet is Becoming a Big Problem

▶︎
Control Center of the Future Road Map for Peru’s System Operator, COES SINAC (English Version)

▶︎
National Grid - Keeping The Lights On

▶︎
Batteries and Renewables: Rewiring Australia’s Grid | FULL DOCUMENTARY

▶︎
How US Air Force B 52 Pilot Performed an Emergency Takeoff at Full Speed

▶︎
National Grid | Fully Charged

▶︎
Control Center of the Future Road Map for Peru’s System Operator, COES SINAC

▶︎
So gigantisch werden Deutschlands neue Mega-Stromspeicher!

▶︎
Boston Public Radio, The Curiosity Desk, & The Culture Show Live Tuesday, June 23, 2026

▶︎
How Do Substations Work?

▶︎
The Real Cost of Net Zero: The shocking truth of the renewable energy push

▶︎
AI Was Never About Helping You | Cory Doctorow

▶︎
Data Center Infrastructure Design Webinar l IEEE LAU Student Branch

▶︎
Introduction to HVDC Transmission⚡️| TheElectricalGuy

▶︎
