Irinel Scriosteanu-Am fost pe șantierul 𝗦𝗲𝗰𝘁̦𝗶𝘂𝗻𝗶𝗶 𝟰: 𝗧𝗶𝗴𝘃𝗲𝗻𝗶-𝗖𝘂𝗿𝘁𝗲𝗮 𝗱𝗲 𝗔𝗿𝗴𝗲𝘀̦ al A1 𝗦𝗶𝗯𝗶𝘂 -𝗣𝗶𝘁𝗲𝘀̦𝘁𝗶
I was on the construction site of Section 4: Tigveni - Curtea de Arges of the Sibiu - Pitesti A1 Motorway, where we are building the first highway-level road tunnel in Romania. In the attached video, I present to you a simulation of a head-to-head car journey from Pitesti to Sibiu, as well as other details and news about the status of the works, which are in the final stage. Current status of Lot 4 works: The percentage of physical progress is 93.50% Currently, works are being carried out on: • Mechanical installations: Daniela tunnel (right) – 85% completed; Alina tunnel (left) – 95% completed • Electrical installations: Daniela tunnel (right) completed – 55%; Alina Tunnel (left) – 65% complete • Portal 1 Operational Building: 97% complete • Portal 2 Operational Building: 97% complete • Earthworks

DRUMURILE NOASTRE. Când vom circula pe SIBIU-PITEȘTI/ CNAIR gestionează LOTURI MUZEU.P1/2

Radu Paraschivescu, despre felul în care George Simion a apărut în politică

Evoluția lucrărilor pe Autostrada A1 Sibiu – Pitești, iunie 2026, lotul Boița – Cornetu

A1 Motorway Sibiu - Pitești | Boița area construction 07/04/2026

A1 construction site, nearly 70% complete

Surpare pe Autostrada A10 Sebeș-Turda

Completely Destroyed Giant Gear Turned into Brand New Gear | Extreme Manufacturing Process

Centura Comarnic | Stadiul Lucrărilor la Sfârșitul Lunii Iunie | 29.06.2026 | Frasinul-Artehnis

🚧 PROBIJANJE PODVOŽNJAKA i Spajanje Bulevara na Novom Beogradu

AUTOSTRADA A1 Sibiu - Pitești | Secțiunea 3 Cornetu - Tigveni | Lucrări 03.06.2026

Primul tunel de autostradă construit prin Munţii Carpaţi | Tronsonul Tigveni - Curtea de Argeş

A7/GATA PENTRU ASFALTARE//UMB termina de betonat Nodul Rutier Bacau Sud/Autostrada Moldovei 02.07

Marius Tucă Show: Invitat: prof. univ. dr. Valentin Stan: "Nicușor Dan s-a închis în propria minte"

Inside Factory Process of Recycling Copper Stator Scrap Into New Royal Largest Copper Vessel

"BEAR TUNNELS" 68% COMPLETE ON THE LUGOJ-DEVA MOTORWAY

AUTOSTRADA A7 Focșani - Bacău Lot 3 | Răcăciuni - Bacău 03.07.2026

Launch event: Integrating AI in TVET - a practical guide for institutions

CĂRĂMIDĂ sau BCA pe INTELESUL TUTUROR! TOT Ce Trebuie să știi înainte să ALEGI !

AUTOSTRADA A1 Margina - Holdea | Stadiul lucrărilor la 05.06.2026

