Absolute block working system|Essential of absolute block working system|Indian railway|signalling|

Hindi rail teck , Absolute block working system|Essential of absolute block working system|Indian railway|signalling| Good evening friends, I am Deepak Kumar , welcome to my channel " HINDI RAIL TECK " Following topic covered in this video. System of working in Indian railway signalling system, Absolute block working system, Essential of absolute block working system, Indian raiway signalling system, Essentials of the Absolute Block System (G.R.8.01) 1. Where trains are worked on the absolute block system: a. No train shall be allowed to leave a block station unless line clear has been received from the block station in advance, and b. On double lines such line clear shall not be given unless the line is clear, not only up to the first stop signal at the block station at which such Line Clear is given but also for an adequate distance beyond it; c. On single lines such Line Clear shall not be given unless the line is clear of trains running in the same direction ,not only up to the first stop signal at the block station at which such Line Clear is given, but also for an adequate distance beyond it, and is clear of trains running in the direction towards the block section to which such line clear is given, 2. Unless otherwise directed by approved special instructions, the adequate distance referred to in clauses (b)and (c) of sub-rule (1) shall not be less than a. 400mts in case of TALQ signalling or TACLS, and b. 180mts in case of MAS or Modified Lower Quadrant Signalling. #absoluteblockworkingsystem Objective questions & answers for railway departmental examinations like station master, goods guard,TC,CC, RAILWAY GROUP B POST ETC -    • Objective questions & answers for railway ...   Railway latest update-    • Railway latest update   Indian railway job-    • Indian railway job   Authorities, standard forms & abnormal working in Indian railway.-    • Authorities, standard forms & abnormal wor...   SPECIFIC WORD USED IN INDIAN RAILWAY. -    • SPECIFIC WORD USED IN INDIAN RAILWAY   INDIAN RAILWAY SIGNALLING SYSTEM.-    • INDIAN RAILWAY SIGNALLING SYSTEM   Railway stations and system of working. -    • Railway stations and system of working   Indian railway train accident & there analysis-    • Indian railway train accident & there anal...   Amazing sights of Indian railway-    • Amazing sights of indian railway   Follow on Blogger- http://hindirailteck.blogspot.com Follow on Facebook-   / hindi.rail.teck   Follow on Instagram-   / hindi.rail.teck   Subscribe my channel-    / hindirailteck   #indianrailway#hindirailteck#sigals#tracks#hindi #essentialofabsoluteblockworkingsystem #systemofworking #indianrailwaysignallingsytem

Indian Railways Automatic Block System - GR 9.01, Semi-Automatic Stop Signal, CTC
▶︎

Indian Railways Automatic Block System - GR 9.01, Semi-Automatic Stop Signal, CTC

European Rail Traffic Management System (ERTMS): Explained
▶︎

European Rail Traffic Management System (ERTMS): Explained

Classifications of Stations - Lesson 4
▶︎

Classifications of Stations - Lesson 4

Outer signal in Indian railway signalling system | जानिए आउटर सिग्नल के बारे में सब कुछ |
▶︎

Outer signal in Indian railway signalling system | जानिए आउटर सिग्नल के बारे में सब कुछ |

HASSDAC GG TRONICS, AXLE COUNTER working in Brief. Indian railways #AIRSTA Jindabad#AIRSTMU Jindabad
▶︎

HASSDAC GG TRONICS, AXLE COUNTER working in Brief. Indian railways #AIRSTA Jindabad#AIRSTMU Jindabad

Automatic block system,T/A912,T/B912,T/C912, T/D912,T/E912, amendment slip 17,Old rule vs New rule
▶︎

Automatic block system,T/A912,T/B912,T/C912, T/D912,T/E912, amendment slip 17,Old rule vs New rule

Defective Advanced Starter Signal GR-3.70 - Indian Railways | अग्रिम प्रस्थान सिग्नल ख़राब
▶︎

Defective Advanced Starter Signal GR-3.70 - Indian Railways | अग्रिम प्रस्थान सिग्नल ख़राब

Railway में Interlocking क्या होती है?
▶︎

Railway में Interlocking क्या होती है?

What are station section, starter signal, advance starter, block section in station
▶︎

What are station section, starter signal, advance starter, block section in station

WHAT IS ABSULUTE BLOCK SYSTEM AND AUTOMATIC BLOCK SYSTEM | SO HYPER
▶︎

WHAT IS ABSULUTE BLOCK SYSTEM AND AUTOMATIC BLOCK SYSTEM | SO HYPER

IB Signal | Intermediate Block Signalling system IBS | Defective IB Signal  #kakshaExpress, #IBS
▶︎

IB Signal | Intermediate Block Signalling system IBS | Defective IB Signal #kakshaExpress, #IBS

BPAC block instruments working on Indian railways
▶︎

BPAC block instruments working on Indian railways

Temporary single line working on double line (TSL) (S.R. 6.02 –1)-Part 1
▶︎

Temporary single line working on double line (TSL) (S.R. 6.02 –1)-Part 1

Distant Signal Warner Signal Indian Rail Signalling System l वार्नर | चेतावनी डिस्टेंट|दूर सिगनल
▶︎

Distant Signal Warner Signal Indian Rail Signalling System l वार्नर | चेतावनी डिस्टेंट|दूर सिगनल

Objective Question Answer of Automatic Block System #locomotive #railway
▶︎

Objective Question Answer of Automatic Block System #locomotive #railway

Disconnection and Reconnection - Lesson 58
▶︎

Disconnection and Reconnection - Lesson 58

Types of railway signals in automatic section | ऑटोमेटिक क्षेत्र के सभी 6 रेलवे सिगनलों को जाने ।
▶︎

Types of railway signals in automatic section | ऑटोमेटिक क्षेत्र के सभी 6 रेलवे सिगनलों को जाने ।

How do Automatic Block Signals work? | Axle counter | Block and Interlocking system
▶︎

How do Automatic Block Signals work? | Axle counter | Block and Interlocking system

AUTOMATIC BLOCK SYSTEM, UNIFIED SUBSIDIARY RULE || USR 9.12 || T/A 912,T/B 912,TC 912,TD 912,TE912
▶︎

AUTOMATIC BLOCK SYSTEM, UNIFIED SUBSIDIARY RULE || USR 9.12 || T/A 912,T/B 912,TC 912,TD 912,TE912

B Class Station Layout, Block Section, Station Limit , Station Section in Indian Railways
▶︎

B Class Station Layout, Block Section, Station Limit , Station Section in Indian Railways