千歳烏山→芦花公園→上北沢 京王線高架化工事の様子(2026年2月)
I observed the progress of the Keio Line elevated construction from Chitose-Karasuyama Station to Kamikitazawa Station. This construction will elevate approximately 7.2 km of the section between Sasazuka Station and Sengawa Station, eliminating 25 level crossings. [Observation Record from February 2026] ① Sengawa Bridge to Chitose-Karasuyama Station • 仙川→千歳烏山 京王線高架化工事の様子(2026年2月) ② Chitose-Karasuyama Station to Roka Park Station to Kamikitazawa Station • 千歳烏山→芦花公園→上北沢 京王線高架化工事の様子(2026年2月) ③ Kamikitazawa Station to Sakurajosui Station to Shimotakaido Station • 上北沢→桜上水→下高井戸 京王線高架化工事の様子(2026年2月) ④ Shimotakaido Station to Meidaimae Station to Daitabashi Station to Sasazuka Station • 下高井戸-明大前-代田橋-笹塚 京王線高架化工事の様子(2026年2月・3月) Please feel free to subscribe and comment! It encourages us to continue creating! ▷Channel Introduction • パンタさんチャンネル紹介2026! ▷Twitter / pantograph234 ▷Blog https://pantasan.com/railway/keio/kei... #ConstructionObservation_Pantasan #KeioElevatedRailwayObservation_Pantasan

Kamikitazawa → Sakurajosui → Shimodakaido: Keio Line Elevation Construction Progress (June 2026)

Chitose-Karasuyama → Roka-koen → Kamikitazawa: Keio Line Elevated Railway Construction Progress (...
![[The Project of the Century!!] Those Who Challenged the Massive Track Reconstruction at JR Shibuy...](https://i.ytimg.com/vi/iisLAQ_ImpM/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLCTsxnEukpJRiX_B-kR1MN48KeK5Q)
[The Project of the Century!!] Those Who Challenged the Massive Track Reconstruction at JR Shibuy...

NEUE S15 ERÖFFNET: 9 Jahre später | Berlins neueste S-Bahnstrecke

【そこに分岐器?!】#283_2026.6.21_名鉄 知立駅高架化工事 観察記 #名鉄 #知立駅 #高架化工事 #知立市 #知立駅高架 #公共事業

【BVE5】京王線完全現代化 4849レ 新線新宿 - 橋本 #bve5

Observing the mysterious construction project to build an above-ground station and eliminate rail...

Shimotakaido-Meidaimae-Daitabashi-Sasazuka Keio Line elevated construction (February and March 2026)

The Shinjuku Line outbound tracks at Higashimurayama Station have been elevated ② [Seibu Railway'...

Construction work on the elevated Keio Line from Chitose-Karasuyama to Roka Park to Kamikitazawa ...

Construction work underway on the elevated railway section of the Keio Line between Sengawa and C...

I Tried Scandinavia’s BRAND NEW International Express Train!

Kamikitazawa → Sakurajosui → Shimotakaido Keio Line elevated construction (February 2026)

【つながる三河線高架!】#282_2026.6.14_名鉄 知立駅高架化工事 観察記 #名鉄 #知立駅 #高架化工事 #知立市 #知立駅高架 #公共事業

【ここでしか見られない】いよいよ切換最終局面!渋谷駅第5回線路切換の最前線に迫る! #工事 #jr東日本 #渋谷駅
![[14 Years] The Revolutionary Changes Brought About by the 3.7km Underground Section: Above-Ground...](https://i.ytimg.com/vi/3qMzNGiMBIU/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLD_2hVTyODYyURDp8dsAYfLIWMCYw)
[14 Years] The Revolutionary Changes Brought About by the 3.7km Underground Section: Above-Ground...

JR山手線 渋谷駅 第4回線路切換工事の舞台裏、全部見せます!

東京メトロ銀座線の裏側に密着…安全支える技術者と保線作業 Tokyo Metro Ginza Line Specialist engineers who support train safety

【大満足】西武線を満喫しながら高架化工事の進捗を観察しました!