Repowering Windpark Freiamt - Errichtung von 2 x Enercon E-138 EP3 E3
The Freiamt wind farm is entering its second round of repowering. Two Enercon E-66/18.70 turbines (85/98 m NH) are being replaced by two Enercon E-138 EP3 E3 turbines (160/111 m NH). The Hohe Eck turbine (111 m NH) is already complete. The major components have already arrived at the Kölblinsberg turbine. The main construction work will begin shortly. Enjoy watching! Comments and likes are always welcome! Subscribe to my channel to stay up to date! Instagram account: @ranger_jonas

▶︎
Repowering Rosskopf Wind Farm (Freiburg) - Part II: Rotor Blade Transport + Erection of Wind Turb...

▶︎
Repowering Rosskopf wind farm - both Enercon E-138 EP3 E3 turbines are fully erected

▶︎
God Says:"MY CHILD, I NEED TO SEE YOU URGENTLY!"/God Message Now/God Message

▶︎
Total Idiots at Work Caught on Camera | Best of 2024

▶︎
Windpark Wiedenfelderhöhe-2

▶︎
Prechtaler Schanze wind farm - Enercon E-115 EP3 E3 in operation

▶︎
65 Unbelievable Aviation Moments Caught on Camera

▶︎
Operation Windrad-Bau: So wird eine Windkraftanlage gebaut | Die Nordreportage | NDR Doku

▶︎
Powering An Old Mill - 1.5 Kw Lake District Overshot Waterwheel Project Part 2

▶︎
Ense wind turbines - Enercon E-138, Tacke TW80, WindWorld W4100

▶︎
Idiots with Fast Trucks: Heavy Equipment Fails | Extreme Oversized Truck Transport #25

▶︎
Repowering Rosskopf Wind Farm - Enercon E-138 EP3 E3 in operation and dismantling of Enercon E-66

▶︎
Windpark Hoßkirch - Erster Windpark mit Vestas V172-7.2 in Deutschland!

▶︎
82 Meter lang: So wird ein Windflügel transportiert

▶︎
Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #7 #adamrose #smartworkers

▶︎
Das zweite Leben der Windräder | ARTE Re:

▶︎
Water Pump Without Electricity That Can Pump Water Up to the Hill

▶︎
Inside a Wind Turbine: How It Really Works

▶︎
Windräder fertigen | Wie geht das? | NDR

▶︎
