New church road bridge is lifted in to place
A new Rail bridge on Church road Garston, Liverpool is lifted in to place. Due to over head lines this had to be done with crane and lifting platform. the bridge serves Garston Freight terminal at Garston Docks. Old bridge removed due to condition new bridge by Shay Murtagh Precast. Carried out by J. Murphy & Sons Ltd and Ainscough cranes More Videos from this job. • Garston rail bridge Removal

▶︎
Removing the second Church road Rail bridge

▶︎
China’s Secret | The Most Unbelievable Megaprojects in China | 4K Travel Documentary

▶︎
Second Garston bridge removal ( crane set up )

▶︎
Bodemsanering Laantje Wijchen deel 13 / afvoeren materieel Van 't Hek

▶︎
Liebherr LR 11000 Kran Koloss in Ulm an der B10 Baustelle zum Abbruch der Wallstraßenbrücke! 1000 t

▶︎
Krandienst Schulz Mobilbaukran MK 88 plus im Einsatz

▶︎
Assembling a large mobile crane that will be used to disassemble a tower crane

▶︎
Demolishing Ogdens Chimney Liverpool 2016 Pt 1

▶︎
World Amazing Modern Technology Road Construction Machines - Biggest Heavy Equipment Machinery

▶︎
ABNORMAL LOAD LEEDS 17 7 16 mp4

▶︎
Rickmansworth Met Rail Bridge Replacement Full Video 2016

▶︎
Garston Rail bridge removal Final part ( time Lapse )

▶︎
Excavator Hitachi 870 LCH Schwertransport 3 Details in the end screen

▶︎
Pulling out the Telescopic Crawler Crane, for 2 days!!!

▶︎
Heavy Shantui Dozer Trapped In Deep Mud & Hyundai Dump Trucks Working Huge Water Area Landfill

▶︎
Tower crane #3 rises: Time-lapse compilation of assembly from start to finish

▶︎
Bodemsanering Laantje Wijchen deel 5 Van 't HEK zwaar transport

▶︎
Incredible Fastest Bridge Construction Technology - Biggest Crane Heavy Equipment Machines Working

▶︎
Mobile Crane Liebherr LTM 1450 8.1 Crane assembly Wilbert WT 420 e.tronic

▶︎
