SERRA DAS ARARAS RJ, MEGA OBRA JULHO 2026.
The construction of the new Serra das Araras ascent on the Presidente Dutra highway (BR-116) represents a total investment of R$ 1.5 billion. The investment includes: The construction of a new eight-lane roadway (four lanes in each direction) with shoulders. The construction of 24 new overpasses, totaling 4.5 km in length, to smooth out the dangerous curves of the current section. The conversion of the current uphill lane to function exclusively as a downhill lane. Installation of three pedestrian overpasses and two escape ramps. The concessionaire responsible for the investment and execution of the works is CCR RioSP (formerly part of Motiva). The resources for financing the project were obtained, in part, through the largest issuance of incentivized debentures in Brazilian history, with the participation of BNDES. The projected completion date for the new uphill lane is March 2028, and for the downhill lane, March 2029. The Federal Government, through the New PAC (Growth Acceleration Program) and with financing structured by BNDES (Brazilian Development Bank), is investing R$ 1.5 billion in the Nova Serra das Araras project on the Presidente Dutra Highway (BR-116). This billion-dollar project will transform the mountain stretch between the municipalities of Piraí and Paracambi, in Rio de Janeiro, bringing the following improvements: Duplication and new lanes: Construction of new lanes with four lanes in each direction, totaling eight lanes. Complex structures: The approximately 8 km route will include 24 viaducts and escape ramps. Renovation of the old section: The current uphill lane will be converted to a downhill lane. Safety and fluidity: The modernization aims to eliminate one of the country's biggest logistical bottlenecks, reducing travel time and increasing driver safety.

Obra da Serra das Araras – Julho de 2026 | Imagens Aéreas de Drone Neo 2

RODOANEL NORTH SECTION CONSTRUCTION IN PERUS

We Bought a $1,000 Abandoned CAT 400 Haul Truck

Updating with fresh news from RJ!

Atualização: ( NOVO TRECHO INAUGURADO) Obra na Serra das Araras …

Serra das Araras RJ. Mega construction project July 2026.

EXCLUSIVO! VOO COMPLETO DE RECIFE-PE A CAJAZEIRAS-PB COM ESCALA EM PATOS-PB DA AZUL CONECTA | 4K 🛫

WILD PACIFIC | The Supreme Predators of the Ocean Depths | Animal Documentary

PASSANDO POR SÃO CRISTÓVÃO-RJ ATÉ A BR-116 EM DUQUE DE CAXIAS-RJ SENTIDO MINAS GERAIS #riodejaneiro

She Thought It Would Fit...

RODOANEL NORTH CONSTRUCTION IN PERUS AND THE APPEARANCE OF YET ANOTHER HUGE OBSTACLE IN THE WAY

First Time in Pakistan! Completely Broken Giant Bearing Manufactured Brand New

SERRA DAS ARARAS CONSTRUCTION - FULL FLIGHT - NEW LAYOUT - 07/07/2026

Transnordestina construction works km 255 Lot 6 Quixeramobim

【前面展望】コンゴ民主共和国 キハ183系(マテテ→キンシャサ中央駅)Cab Ride in DR Congo🇨🇩 Matete - Kinshasa Express Train Kiha 183

A 60-Year-Old Builder Mixed Cement with Paint! Turning the Impossible into a Million-Dollar Secret

From Rio to São Paulo: New lane at Serra das Araras

🚨 MEGA STRIKE ALERT 🚀 4 Tu-22M3 Bombers Airborne ✈️ Black Sea Battle Escalates 🌊⚓ MS 2026.07.15

Chegada ao Rio pela Janela | Pouso no Galeão em um Boeing 737 da GOL

