BATU JOMBA❗️JALAN DITUTUP DAN KEMACETAN PANJANG”PENGECORAN DPT SAMPAI MALAM.
There was a long traffic jam that lasted until the evening, the road was temporarily closed, the casting of the concrete wall took a long time #BatuJombaToday #BatuJombaterbaru #RoadCountruction #TruckMixer #Excavator #Bed #Concreting #

▶︎
Incredible Results❗️DPT Project backfilling is 50% complete & formwork removal has begun

▶︎
PART 2‼️SARAS TRANS INDO NATIONAL DEFENSE PACKAGE TRUCK JOURNEY TO SUMATRA ISLAND

▶︎
Batu Jomba route‼️Great job, the formwork is done and immediately removed

▶︎
【前面展望】コンゴ民主共和国 キハ183系(マテテ→キンシャサ中央駅)Cab Ride in DR Congo🇨🇩 Matete - Kinshasa Express Train Kiha 183

▶︎
PAWEIXUN AJAK GEGE BELANJA LAUK DIPENJUAL KELILING LALU PANEN DAN MAKAN NANGKA, GEGE MAKIN BETAH NIH

▶︎
WAJAR KDM MURKA..!! INI CONTOH NYA KALI PESANGGRAHAN MULAI MENYEMPIT

▶︎
SIBA SURYA TRAILER TRUCK IS A HERO AGAIN AT BUKIT KODOK || GOOD DRIVER, TRUCK EVACUATION

▶︎
Latest Progress Update on the Batu Jomba Retaining Wall || Assembling Concrete Chutes for the 2nd...

▶︎
HEAVY RAIN”CONTINUATION OF RETAINING WALL CONSTRUCTION DELAYED”LANDSLIDE INCREASES AGAIN

▶︎
KDM ENFORCES RULES‼️POLICE POSTS & ORGANIZATION OUTPOSTS IN BANGLI DEMOLISHED AT CIKAMPEK FLYOVER

▶︎
Update Hari ini ‼️Progres Pembangunan Groundsill Srandakan 17 Juli 2026

▶︎
BAD INCIDENT!! HEAVILY LOADED TRUCK FAILS TO CLIMB KEDABUHAN HILL IN SUBULUSSALAM

▶︎
20 Years on the River: Cooking and Living on a Tiny Boat on a Rainy Day

▶︎
IT'S DONE‼️THE CONCRETE POURING IS DRAGGING ON AND TESTING OUR PATIENCE OVER THIS TRIVIAL THING!!

▶︎
Residents Demand Removal of Clog Culprit From Under Bridge || Bolang River Normalization

▶︎
RETAINING WALL AREA CLEARED; BACKFILLING OF RAVINE CONTINUES.

▶︎
Rusted CAT Grader Restored to Factory Condition | Full Restoration Process

▶︎
Swapping Units, First Trip Requires a Full Vehicle Check and Retuning

▶︎
Awesome‼️ The Later It Gets, The More Monster Mud Treasure Hunters There Are

▶︎