Replacing a Century-Old Crane System at PTI Transformers | Acculift Case Study

When a nearly 100-year-old overhead crane suffered a major component failure, PTI Transformers faced a critical decision: rebuild aging equipment or invest in a modern crane system built for the future. In this case study, see how Acculift partnered with PTI Transformers to safely remove and replace a century-old crane operating inside an active manufacturing facility. The project required extensive planning, coordination between multiple contractors, roof removal, and the use of a 300-ton crawler crane to remove and install crane components weighing up to 35 tons. The result was a modern 60-ton overhead crane system featuring enhanced safety, improved operator control, and long-term reliability for one of PTI's most critical production areas. Project Highlights: ✔ Removal of a nearly 100-year-old crane system ✔ Installation completed within an active manufacturing facility ✔ 300-ton crawler crane utilized for removal and installation ✔ 60-ton lifting capacity ✔ VFD controls for smooth and precise operation ✔ Blue footprint safety lighting ✔ Completed safely, on schedule, and on budget Learn more about Acculift: https://www.acculift.ca Need help with a crane modernization or replacement project? Contact our team today. #OverheadCrane #CraneReplacement #Manufacturing #MaterialHandling #PTITransformers #IndustrialProjects #Acculift #OverheadCranes