MBTA Framingham/Worcester Line: Full Ride on Train #513 (South Station-Worcester)
Of the commuter-rail lines that the Massachusetts Bay Transportation Authority (MBTA) operates, the Framingham/Worcester line is currently the second busiest line by daily ridership. The line runs from South Station in Boston, Massachusetts to Union Station in Worcester, Massachusetts, the largest and second largest cities in the New England region respectively. The total line-length is exactly 44.3 miles (71.3 km). The line operates all seven days of the week, with most trains running the full-route between South Station and Union Station, with a few weekday-only trains terminating at Framingham station. The entire line is owned by the MBTA, but is also shared with CSX freight-trains and Amtrak's daily "Lake Shore Limited" Boston to Chicago overnight train. The maximum speed for trains operating along the line is 79 MPH, however the average speed is a lot lower. In this video we're on-board Framingham/Worcester Line train #513, the weekday off-peak outbound train to Worcester Union Station, making all stops along the way. Our train consists of several Hyundai-Rotem BTC-4D bi-level coaches with BTC-4D cabcar #1818 on the rear. The leading locomotive is EMD GP40MC Locomotive #1122. Since we're an outbound train we are operating in "pull-mode" where the locomotive is on the front of the train and a cab car is at the rear-end. Our station stops along the way are Back Bay, Yawkey, Boston Landing, Newtonville, West Newton, Auburndale, Wellesley Farms, Wellesley Hills, Wellesley Square, Natick Center, West Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. Departure time from South Station is 11:55 AM and arrival time into Worcester is 1:25 PM. Video recorded on Tuesday, October 9, 2018 with an Apple iPhone 6S. Rendered and edited using Sony Vegas Pro 15. Video Timetable Index: 0:00 - Slowly crawling out of South Station 3:30 - Back Bay Station 7:15 - Yawkey Station 12:17 - Boston Landing Station 17:47 - Newtonville Station 20:51 - West Newton Station 23:09 - Auburndale Station 27:16 - Wellesley Farms Station 29:13 - Wellesley Hills Station 31:53 - Wellesley Square Station 36:24 - Natick Center Station 39:49 - West Natick Station 43:02 - Waverly Street Grade Crossing 43:20 - Framingham Station 47:30 - Main Street (Ashland) Grade Crossing 47:40 - Cherry Street Grade Crossing 48:20 - Ashland Station 51:55 - Southborough Station 59:41 - Westborough Station 1:03:37 - Grafton Station 1:05:40 - Paramenter Lane Grade Crossing 1:14:00 - CSX Worcester Yard 1:16:30 - Worcester Station

MBTA East Route Main Line 1997 Part 1

Conrail Mail 3 Cab Ride S. Kearny NJ to Harrisburg PA 1998

Riding MBTA commuter rail Framingham/Worcester line Local train#1508 from Worcester to South station

FULL Ride from New York to Washington Aboard Amtrak Acela Express 2107 8/4/23

CTA's Ride the Rails: Red Line to 95th/Dan Ryan Real-time (2019)

CSX assisting Amtrak 81

Underground Trolleybuses in Boston | The MBTA Silver Line | FREE from Logan Airport to South Station

{4K} VRE Full Cabride Spotsylvania, VA-Washington, DC (VRE Fredericksburg Line) (8/4/2023)

⁴ᴷ⁶⁰ Long Island Railroad Front Window View - The Eastbound Port Washington Branch
![Amtrak Downeaster #683 Full Ride From Boston North Station to Brunswick [8-10-20]](https://i.ytimg.com/vi/67tFZBlNRWM/hqdefault.jpg?sqp=-oaymwE9CNACELwBSFryq4qpAy8IARUAAAAAGAElAADIQj0AgKJDeAHwAQH4AdQGgALgA4oCDAgAEAEYciBeKEcwDw==&rs=AOn4CLBrcG1_bJxqMAGi-Hzv2kItKhrkuA)
Amtrak Downeaster #683 Full Ride From Boston North Station to Brunswick [8-10-20]

Gatwick Airport to London Victoria, Class 442 | *DRIVERS EYE VIEW*

We took an MBTA train from the WORST STATION

The Chiasson Archives: MBTA Needham Line

⁴ᴷ⁶⁰ Long Island Railroad Front Window View - The Westbound Long Beach Branch
![[4K] – Full Ride – Boston's MBTA Worcester Line – Westbound – South Station – Worcester](https://i.ytimg.com/vi/1YDEKS1vTN0/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLB4Hz25GfsHpFpjanXLysIjIYVwnw)
[4K] – Full Ride – Boston's MBTA Worcester Line – Westbound – South Station – Worcester

On Board Amtrak Empire Service Train #233 (New York Penn Station - Albany-Rensselaer) (6/13/2021)

Trail to be Restored as Rail Transit? MBTA Green Line Extension to Needham - 4/2026

SEPTA Metro L Train - L1 Market-Frankford Line All Stops (with Next-Stop Informational Graphics)
![MTA LIRR Train #266: M9 🟢Babylon Branch🟢 Train [Grand Central to Babylon]](https://i.ytimg.com/vi/jzRTRJHtZas/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLADuRMeTi0zQeFV7PF-QAoNNtanBA)
MTA LIRR Train #266: M9 🟢Babylon Branch🟢 Train [Grand Central to Babylon]

