Bridge Assembly in Karlstad, Sweden

Equipment: Spmt’s, 100Te climbing jacks, 2x130 te hydraulic cranes, 220 te hydraulic crane for last module. SoW: Method, engineering, project management and operation. Challenges: Limited time frame, very tight and limited access, mating of modules below 10mm accuracy.