Windpark Bad Lauchstädt-Holleben / 8× Vestas V162 EnVentus, 21× Vestas V90, 17× GE Wind Energy 1.5sl

Bad Lauchstädt-Holleben-Große Schanze Wind Farm - Photo taken on August 16, 2024 Today, after some time away, I visited my local wind farm, Bad Lauchstädt-Holleben-Große Schanze, and I was fortunate enough to see all eight new Vestas V162 EnVentus turbines rotating. These eight new Vestas V162 EnVentus turbines were built as part of an expansion project and have been operational since April 2024. ... Expansion Details / Bad Lauchstädt Wind Farm: Turbine/Manufacturer = Vestas V162 EnVentus Number of turbines = 8 Tower/Hub height = 2 x 119 meters, 1 x 166 meters & 5 x 169 meters Tower type = 2 x steel towers & 6 x Max Bögl hybrid towers Electricity/Nominal output = 6.2 megawatts / 6200 kilowatts Rotor diameter = 162 meters Rotor blade length = 79.7 meters Crane = Mammoet "LG 1750" Operator = Terrawatt & Aventron Year of construction = 2023 and 2024 Link to operator Terrawatt = https://www.terrawatt.de/ Link to operator Aventron = https://www.aventron.com/home.html Link to crane "Mammoet LG1750" = https://www.mammoet.com/de/equipment/... Link 1 to the Vestas V162 EnVentus = https://www.wind-turbine-models.com/t... Link 2 to the Vestas V162 EnVentus = https://www.vestas.com/en/energy-solu... Link to the rotor blade transport assistant = https://youtube.com/@M.B.BF3?si=AwXJY... Registration number of wind turbine 4 = V248534 Link to registration = https://www.wea-nis.de/ Registration number of wind turbine 8 = V248537 Link to registration = https://www.wea-nis.de/ List of the 8 Vestas V162 EnVentus turbines: Turbine 1 / 169 meters Turbine 2 / 169 meters Turbine 3 / 119 meters Turbine 4 / 169 meters Turbine 5 / 169 meters Turbine 6 / 119 meters Turbine 7 / 169 meters Turbine 8 / 166 meters ------------------------------------------------------------------- In 2012 and 2013, 21 additional Vestas V90 Gridstreamer turbines were installed in the Große Schanze wind farm. Turbine 1 / 169 meters Turbine 2 / 169 meters Turbine 3 / 119 meters Turbine 4 / 169 meters Turbine 5 / 169 meters Turbine 6 / 119 meters Turbine 7 / 169 meters Turbine 8 / 166 meters ------------------------------------------------------------------- In the Große Schanze wind farm, 21 additional Vestas V90 Gridstreamer turbines were installed in 2012 and 2013. Turbine 1 / 169 meters Turbine 2 / 169 meters Turbine 3 / 119 meters Turbine 4 / 169 meters Turbine 5 / 169 meters Turbine 6 / 119 meters Turbine 7 / 169 meters Turbine 8 / 166 meters Turbine 8 / 166 meters Turbine 8 / 169 meters Turbine 8 / 169 meters Turbine 8 / 169 meters Turbine 8 / 169 meters Turbine Vestas V90 Gridstreamer / Große Schanze Wind Farm in Detail: Plant/Manufacturer = Vestas V90 Gridstreamer Number of Turbines = 21 Tower/Hub Height = 105 meters Power Output/Nominal Power = 2 megawatts / 2000 kilowatts Rotor Diameter = 90 meters Operators = Terrawatt, Notus Energy, and Saxovent Year of Construction = 2012 and 2013 Link to Terrawatt = https://www.terrawatt.de/ Link to Notus Energy = https://www.notus.de/ Link to Saxovent = https://saxovent.com/ Link to Construction Video =    • NOTUS energy - Zeitraffer-Baufilm - Windpa...   Link to Vestas V90 Gridstreamer = https://www.wind-turbine-models.com/t... ---------------------------------------------------------------------- Seventeen GE Wind Energy 1.5sl turbines were built in the Holleben wind farm in 2004 and 2005. These 17 turbines are where it all began. GE Wind Energy 1.5sl / Holleben Wind Farm in Detail: Tiller/Manufacturer = GE General Electric "GE Wind Energy 1.5sl" Number of Turbines = 17 Tower/Hub Height = 100 meters Power Output/Rated Power = 1.5 megawatts / 1500 kilowatts Rotor Diameter = 77 meters Operators = eab New Energy and Heliotec Year of Construction = 2004 and 2005 Link to the operator eab New Energy = https://www.eab-newenergy.eu/de/ Link to Operator Heliotec = https://heliotec.de/start/ Link to the GE Wind Energy 1.5sl = https://www.wind-turbine-models.com/t... Link to GE General Electric = https://www.ge.com/ ------------------------------------------------------------------- The "WindEnergy Trade Fair" will take place in Hamburg from September 24th to 27th, 2024. Link to the WindEnergy Trade Fair Hamburg = https://www.windenergyhamburg.de/ Enjoy the video :-)

God Says:"MY CHILD, I NEED TO SEE YOU URGENTLY!"/God Message Now/God Message
▶︎

God Says:"MY CHILD, I NEED TO SEE YOU URGENTLY!"/God Message Now/God Message

Vestas V150-5.6 MW EnVentus wind turbines under construction part 1
▶︎

Vestas V150-5.6 MW EnVentus wind turbines under construction part 1

Windpark Niederhelsum Teil 1
▶︎

Windpark Niederhelsum Teil 1

God Says:"A CALL FROM GOD — OPEN IMMEDIATELY!"/God Message Now/God Message
▶︎

God Says:"A CALL FROM GOD — OPEN IMMEDIATELY!"/God Message Now/God Message

ساعة من السكينة مع القرآن❤️😌 | تلاوة هادئة للنوم والاسترخاء🕊️🎧 | Deep Tranquility
▶︎

ساعة من السكينة مع القرآن❤️😌 | تلاوة هادئة للنوم والاسترخاء🕊️🎧 | Deep Tranquility

Compilatie van dronevideo's van windparken in Belgïe 🇧🇪 5.0
▶︎

Compilatie van dronevideo's van windparken in Belgïe 🇧🇪 5.0

Das zweite Leben der Windräder | ARTE Re:
▶︎

Das zweite Leben der Windräder | ARTE Re:

Unbelievable Train Moments Caught on Camera
▶︎

Unbelievable Train Moments Caught on Camera

Wöhrden Wind Farm - Vestas V162, V112, V27 and Enercon E-115 EP3, E-126 EP3
▶︎

Wöhrden Wind Farm - Vestas V162, V112, V27 and Enercon E-115 EP3, E-126 EP3

Most Ridiculous Worker Mistakes Caught on Camera
▶︎

Most Ridiculous Worker Mistakes Caught on Camera

Voith: Functioning of Pelton turbines (EN)
▶︎

Voith: Functioning of Pelton turbines (EN)

Operation Windrad-Bau: So wird eine Windkraftanlage gebaut | Die Nordreportage | NDR Doku
▶︎

Operation Windrad-Bau: So wird eine Windkraftanlage gebaut | Die Nordreportage | NDR Doku

2014 0908 Windrad Haard, der Stern
▶︎

2014 0908 Windrad Haard, der Stern

Repowering Windpark Stößen / 7× E138 EP3 E2, 2× E115 EP3 E3-4.2 & 1× E103 EP2 für 15× Enercon E66
▶︎

Repowering Windpark Stößen / 7× E138 EP3 E2, 2× E115 EP3 E3-4.2 & 1× E103 EP2 für 15× Enercon E66

Bad Lauchstädt/Holleben wind farm, Vestas V90, V162, Ge Wind Energy 1.5sl wind turbines 17.02.2024
▶︎

Bad Lauchstädt/Holleben wind farm, Vestas V90, V162, Ge Wind Energy 1.5sl wind turbines 17.02.2024

Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #5 #adamrose #smartworkers
▶︎

Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #5 #adamrose #smartworkers

Idiots with Fast Trucks: Heavy Equipment Fails | Extreme Oversized Truck Transport #25
▶︎

Idiots with Fast Trucks: Heavy Equipment Fails | Extreme Oversized Truck Transport #25

Inside a Wind Turbine: How It Really Works
▶︎

Inside a Wind Turbine: How It Really Works

Spectacular! Archimedes turbine beats any propeller!
▶︎

Spectacular! Archimedes turbine beats any propeller!

Windpark Hüselitz-Lüderitz-Bellingen / 42× Vestas V112, 4× Vestas V126 & 6× Vestas V162-6.2 EnVentus
▶︎

Windpark Hüselitz-Lüderitz-Bellingen / 42× Vestas V112, 4× Vestas V126 & 6× Vestas V162-6.2 EnVentus