Fretwork Rail 'The Final Pour' - 7 1/4 Narrow Gauge Railway

We join our infrastructure team 'Fretwork Rail' as they complete the final concrete pour of the railways construction. The tramway has been a project over the last 12 months extending the railway and creating new connections to workshops and increasing how many trains we can operate.

Clunky gets a spannering & Fretwork Rail out on track maintenance - 7 1/4 Narrow Gauge Railway
▶︎

Clunky gets a spannering & Fretwork Rail out on track maintenance - 7 1/4 Narrow Gauge Railway

Could this tiny rural station really have saved a British railway line?
▶︎

Could this tiny rural station really have saved a British railway line?

Building an Off-Grid Cabin to Last 100 Years in the Canadian Wilderness
▶︎

Building an Off-Grid Cabin to Last 100 Years in the Canadian Wilderness

Fretwork Rail install a concrete set point in the tramway extension - Somerset Narrow Gauge - 7 1/4
▶︎

Fretwork Rail install a concrete set point in the tramway extension - Somerset Narrow Gauge - 7 1/4

Introducing My 5 Inch Gauge Locomotives
▶︎

Introducing My 5 Inch Gauge Locomotives

2 foot gauge railway FIRST SWITCH
▶︎

2 foot gauge railway FIRST SWITCH

OMG Incredible HYUNDAI Dump Truck & Dozer KOMATSU Loading Rock Soil Into Water
▶︎

OMG Incredible HYUNDAI Dump Truck & Dozer KOMATSU Loading Rock Soil Into Water

Amazing Technique of Pakistani People Digging Wells for Dry Farmland - @Amazing Experts
▶︎

Amazing Technique of Pakistani People Digging Wells for Dry Farmland - @Amazing Experts

Abandoned Dozer In Pond | Can We Save It?
▶︎

Abandoned Dozer In Pond | Can We Save It?

M-A-N Ackerdiesel Tractor Promotional Film Factory Tour, Company Portrait, Image Film All-Wheel D...
▶︎

M-A-N Ackerdiesel Tractor Promotional Film Factory Tour, Company Portrait, Image Film All-Wheel D...

Fretwork Rail install a Head Shunt - 7 1/4 Narrow Gauge
▶︎

Fretwork Rail install a Head Shunt - 7 1/4 Narrow Gauge

Unbelievable Smart Workers Compilation 2026 🚧👷 Smart Engineers vs Construction Fails #11
▶︎

Unbelievable Smart Workers Compilation 2026 🚧👷 Smart Engineers vs Construction Fails #11

Extreme Landfill Operation! Massive Dump Trucks Moving Tons of Soil and Skills Dozer Push Soil Fast
▶︎

Extreme Landfill Operation! Massive Dump Trucks Moving Tons of Soil and Skills Dozer Push Soil Fast

This Is How They Crafted Clay Pipes Over 100 Years Ago
▶︎

This Is How They Crafted Clay Pipes Over 100 Years Ago

Laying Track to the Woodline
▶︎

Laying Track to the Woodline

The Return of the Romulus - 7 1/4 Narrow Gauge
▶︎

The Return of the Romulus - 7 1/4 Narrow Gauge

Tractor Rescue: Getting This Muddy Beast Running Like New
▶︎

Tractor Rescue: Getting This Muddy Beast Running Like New

The Greatest Garden Railway of all time - with the Biggest Working Steam Locomotive in the UK.
▶︎

The Greatest Garden Railway of all time - with the Biggest Working Steam Locomotive in the UK.

272. The deepest, highest, longest canal tunnel in Britain
▶︎

272. The deepest, highest, longest canal tunnel in Britain

DB 232 241-0 mit Notfallkranzug am 07.06.26 in Bautzen
▶︎

DB 232 241-0 mit Notfallkranzug am 07.06.26 in Bautzen