We Get Our Energy From the Sun!

We Get Our Energy From the Sun! As the Eurasia Tunnel, we have added a new link to our sustainability chain. We have completed and commissioned a Solar Power Plant (SPP) with a production capacity of 300.30 kWp at the Operations and Maintenance Building, as well as the Asian Ventilation and Transformer Buildings. Designed with 546 solar panels, the SPP will contribute to the electricity needs of Eurasia Tunnel operations. With an annual production of 322,880 kWh, we aim to reduce carbon emissions by 210 tons per year by sourcing our energy from clean sources. #EurasiaTunnel #solarpanel