Einar erklärt Eisenbahn - Vectron (A1 durchführen)
A Class 193 locomotive isn't simply switched off at the end of a working day. When a Siemens Vectron finishes work, there are a few things to do. Checks, functional tests, and operating procedures for the final tasks of Level A1 are demonstrated here. These generally apply to all variants; the order or scope may vary depending on the railway company. The following applies in principle: First, secure the locomotive only with the spring-loaded brake to check the indicator lights. Hold the SA for the relevant network raised to check the condition and completeness of the contact strips. Operate the sanding device in both directions and check its function. Be sure to vent the main air line before switching over the Piastra Pneumatica (Pneumatic Rail System), if present! At the end, open an air shut-off valve on the main air line.

Schulungsfilm: 15.000 Volt / 16,7 Hz - BG ETEM

E-Traktion Teil 6. Starting BR-193 Vectron. Vorbereitungsdienst V1. Przyjęcie lokomotywy.

Einar explains railway - Recommissioning of PZB / LZB (Vectron)

Die Baureihe 119 - Die letzte Diesellok der DR

Vectron DualMode

Most Ridiculous Worker Mistakes Caught on Camera

Was darf ein Lokführer alles?

BEST OF Nürtinger Bahnhof

Was Westdeutsche nie über DDR Autos verstanden haben

Putin wollte Russland mit der Ukraine groß machen – jetzt ist es kleiner denn je

Die PZB für Anfänger ganz einfach erklärt!

Der Vectron

Unterschied zwischen Lf7 und Zs3

Einar erklärt Eisenbahn - Siemens X4 Vectron Lokomotive erden

Aufrüsten einer BR 482/185

If These Train Moments Weren’t Filmed, Nobody Would Believe Them

Wie geht das? Ein Hauptsignal kommt auf Fahrt.

Unbelievable Train Moments Caught on Camera

Indusi und PZB 90 für Interessierte und Dummies erklärt - Alex E

