Helicopter Wind Farm Transfer - Westermost Rough
Transfer from Siemens SWT-6.0-154 Wind Turbine at the DONG Energy Westermost Rough Project. Aviation services provided by Uni-Fly A/S. November 8, 2015 Sea conditions prohibited transfer to and from turbine by vessel so helicopter was used to access turbine for maintenance. Wind speeds during transfer varied between 15 - 20 m/s (33 - 45 mph). For normal transfer vessels, the trip to the wind farm from the port of Grimsby is 2 hours. Flight time to site by helicopter from Humberside Airport is around 12 minutes. Training requirements for helicopter transfer include, HUET (Helicopter Underwater Evacuation Training), Tower Rescue Up, and Helicopter Hoist Operator training.

▶︎
Vortex Ring State IS NOT Settling With Power

▶︎
Schwerlast Hubschrauber im Brunnital Uri

▶︎
Offshore Wind Turbine Helicopter Pickup and Dropoff

▶︎
Heli Logging Fallers BC Coast Miskatla Inlet

▶︎
Borkum Riffgat transfer in 40kn wind, 2 m waves CTV: Bayard2

▶︎
Spacer Installation on 765,000 volt line

▶︎
INTO THE FIRE! - Canadair CL-415 Firefighting - Croatian Air Force 2025

▶︎
rescue from WInd Turbine

▶︎
Classic crew change

▶︎
Training On The Job 2017 Rotor Blade Repair

▶︎
CRAZY DISPLAY ! | EC-145 "Choucas 74" | French Gendarmerie | Chamonix Mt-Blanc

▶︎
Erecting a Herblet Ralls Transmission Tower

▶︎
Offshore Wind Turbine Installation - Part 1

▶︎
15 minutes in the life of a SA 315 B Lama

▶︎
Wind Turbine Rope Access HD

▶︎
99 Unbelievable Aviation Moments Caught on Camera

▶︎
Nordex N90 Grighine

▶︎
Offshore CTV transfer

▶︎
Mi-6 helicopter launch at the museum

▶︎
