Minimising the Handling Cost in "Process Oriented Layout. Lecture # 08
0:00 Process Oriented Layout 0:52 Introduction to handling cost 3:33 Equation for handling cost 6:08 Problem/Example 6:45 Number of units table 14:24 Problem Conditions 18:10 solution to the problem 20:16 Initial cost calculations 24:17 Minimizing the handling cost 28:42 Minimized handling cost Calculation ▶A machine shop, consisting of 6 distinct production areas is planning to redesign its layout. The building is 90 feet long and 40 feet wide, with all production areas of equal size. The material handling equipment being used can only move clockwise on marked pathways, with loading/ unloading possible only at the center of the production area. The pathways have only been marked horizontally and vertically and no diagonal movement of the loads between departments is possible. Management has estimated that the cost of moving a single load in the facility is $1 for every 10 feet. Flow matrix between different departments over the last month and current layout are given. ▶ Design two layouts aimed at reducing the total material handling cost. In the process layout we try to minimize the handling cost. The cost associated with the handling might be different from one route to another route. To minimize this cost by adjusting the position of each working cell or processes. Movement of the equipment or the parts from one process to another process is associated with a certain cost. This cost vary from process to process based on the distance between each processes. Now this is the technique that we use for minimizing the overall cost of the movement from one process to another process.

Components of Time Series (Trends, Seasonal, Cyclic and Random variations) Lecture # 09

Layout Strategies Ch9 Part II

Closeness Ratings

Facility Planning: Line balance solved example

Facility Layout - Operations Sequence Analysis

Facility Layout in Operations Management - Product vs Process Oriented Layout & Fixed

How to design a Lean Layout/Obeyaka? The Lean Manufacturing Guide

The Insane Genius of a Formula 1 Gearbox

Locational Break-Even Analysis. Lecture # 06.

Operations Layout – Assembly Line Balancing I

University of Cambridge Maths Admissions Interview

🚗 BYD : The biggest SCAM of the car industry ?

Most Mechanical Engineers Use the Wrong Fasteners

𝐋𝐢𝐧𝐞 𝐁𝐚𝐥𝐚𝐧𝐜𝐢𝐧𝐠 | Production Line Balancing ? | Assembly Line Balancing in operations management

Lean Manufacturing: MIND-BLOWING Factory Tour! (Behind The Scenes)

Chap 9 Layout Strategies

How to Speak

Operations Layout: Assembly Line Balancing II

Capacity, Bottlenecks & Utilization Explained — Operations Management

