Windpark Erftstadt - mit Nordex N117, N131 und N149

In this video, I visit the newly constructed wind farms around Erftstadt. Due to height restrictions imposed by the nearby Nörvenich Air Base, all turbines here are also subject to a height limit of 150-180 meters. A total of 12 turbines were erected in the Erftstadt-Friesenheim wind farm: 8 x Nordex N131-3.6 with a hub height of 99 meters 4 x Nordex N117-3.5 with a hub height of 120 meters Two new wind farms with a total of 14 turbines are being built around Erftstadt-Erp: 2 x Nordex N149/5.X 2 x Nordex N131 with a hub height of 106 meters 6 x Nordex N131 with a hub height of 99 meters 4 x Nordex N131 with a hub height of 84 meters Enjoy the video! Comments and likes are always welcome! Subscribe to my channel to stay up-to-date! Instagram account: @ranger_jonas

Windpark Bennrather Börde - mit 4 neuen Enercon E-82
▶︎

Windpark Bennrather Börde - mit 4 neuen Enercon E-82

Operation Windrad-Bau: So wird eine Windkraftanlage gebaut | Die Nordreportage | NDR Doku
▶︎

Operation Windrad-Bau: So wird eine Windkraftanlage gebaut | Die Nordreportage | NDR Doku

65 Unbelievable Aviation Moments Caught on Camera
▶︎

65 Unbelievable Aviation Moments Caught on Camera

Groß Ziescht Mahlsdorf Wind farm @M.B.BF3
▶︎

Groß Ziescht Mahlsdorf Wind farm @M.B.BF3

Windpark Wiedenfelderhöhe-2
▶︎

Windpark Wiedenfelderhöhe-2

Erftstadt-Erp wind farm - with new Nordex N131 and N149
▶︎

Erftstadt-Erp wind farm - with new Nordex N131 and N149

Erneuerbare Energie: Zu viel Solar- und Windenergie für das Stromnetz?  | Panorama 3
▶︎

Erneuerbare Energie: Zu viel Solar- und Windenergie für das Stromnetz? | Panorama 3

Inside a Wind Turbine: How It Really Works
▶︎

Inside a Wind Turbine: How It Really Works

This farmer has earned millions of dollars. Transform old bicycle wheels into powerful generators
▶︎

This farmer has earned millions of dollars. Transform old bicycle wheels into powerful generators

Belecke Wind Farm - Enercon, Tacke, DeWind, WindWorld, Nordex, NEG Micon, AN Bonus Wind Turbines
▶︎

Belecke Wind Farm - Enercon, Tacke, DeWind, WindWorld, Nordex, NEG Micon, AN Bonus Wind Turbines

Entstehung des Windparks Ahrensfeld Wittefeld in Bramsche
▶︎

Entstehung des Windparks Ahrensfeld Wittefeld in Bramsche

Windräder fertigen | Wie geht das? | NDR
▶︎

Windräder fertigen | Wie geht das? | NDR

Prechtaler Schanze wind farm - All three Enercon E-115 EP3 E3 turbines are erected
▶︎

Prechtaler Schanze wind farm - All three Enercon E-115 EP3 E3 turbines are erected

Rope Access on Wind turbines Climbing
▶︎

Rope Access on Wind turbines Climbing

Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #8 #adamrose #smartworkers
▶︎

Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #8 #adamrose #smartworkers

Biggest Ship Collisions and Mistakes Caught on Camera
▶︎

Biggest Ship Collisions and Mistakes Caught on Camera

Repowering Rosskopf Wind Farm (Freiburg) - Part II: Rotor Blade Transport + Erection of Wind Turb...
▶︎

Repowering Rosskopf Wind Farm (Freiburg) - Part II: Rotor Blade Transport + Erection of Wind Turb...

Windpark Bad Lauchstädt / 5 von 8 "Vestas V162-6.2 EnVentus" fertig errichtet / 4 Anlagen in Betrieb
▶︎

Windpark Bad Lauchstädt / 5 von 8 "Vestas V162-6.2 EnVentus" fertig errichtet / 4 Anlagen in Betrieb

Der Händler lachte über den rostigen Lanz für 150 Mark — was unter dem Tank lag, schockierte jeden
▶︎

Der Händler lachte über den rostigen Lanz für 150 Mark — was unter dem Tank lag, schockierte jeden

Abbau von 44 Stück Enercon E-66 Anlagen
▶︎

Abbau von 44 Stück Enercon E-66 Anlagen