S02E85 Silikon - jak go dobrze zrobić

#haharbud #budujemydomusamemu #zbudujsamdom #sabudujedom #114m2 #dom114 #budujemyzpasja #renovation #construction Building a house using an economic system. The house is 63 m², but has a usable attic, for a total of 114 m². COSTS: Paperwork Design PLN 999 Municipality Local Zoning Plan PLN 50 Adaptation + modifications PLN 3,000 + PLN 900 Geotechnical survey PLN 1,033 Plot preparation: Temporary fencing PLN 550 Foundation for a metal frame PLN 500 Metal frame PLN 3,700 Foundations: Surveyor PLN 800 Excavator PLN 800 (5.5 hours of work) Steel 12 x 20 mm rod PLN 60 - PLN 1,200 6 x 40 mm rod PLN 10 - PLN 400 Ready-mix concrete (I got 18 m³) PLN 300 - PLN 5,400 Concrete blocks 560 pcs. 3.80 - PLN 2,128 Sand 20t PLN 450 Cement 20 bags of PLN 16 - PLN 320 Sewage pipe 160 mm 0.5 m - PLN 30 Arot (electricity culvert) 4m - PLN 20 Water culvert (pipes 110 mm) - PLN 110 Gravel 2t - PLN 200 Dysperbit DN 5x PLN 75 - PLN 375 Hydrostyr 100 mm - 13 x PLN 148 1924 Styrofoam adhesive 7 x PLN 26 182 Backfill sand 75 tons PLN 1,300 Sewage pipes PLN 1,400 Anti-shrink reinforcing mesh 42 pcs. PLN 8 each - PLN 336 Concrete B15 - 8 m3 PLN 330 each - PLN 2640 H+H 1008 pcs PLN 14 each - PLN 14112 Thin-bed mortar 18 pcs PLN 23 each - PLN 414 Tytan foam adhesive 10 pcs xx PLN 46 each - PLN 460 Ground floor lintels - PLN 1052 2 bags of mortar - PLN 30 8m flue gas chimney + 2 vents - PLN 2600 8m flue gas chimney for fireplace + 2 vents - PLN 2616 Teriva ceiling beams + slats - PLN 8700 L-shaped collar profiles - PLN 1000 Stair formwork boards - PLN 1000 Steel for stairs 4 x 12 - 200 Support reinforcement - 504 Concrete for the ceiling 9m³ - 3150 Steel for the ring beam and separating ribs 20xØ12 - 1000 Thin-bed mortar 6x23 - 138 Ring beam: Steel 12 pcs. Ø12 - 600 25 pcs. Ø6 - 200 Concrete B25 3.5 m³ - 1300 Wall batten 30m/b - 900 Wall batten holder 18 pcs. - 162 Rafters and collar beams - 5900 Thin-bed mortar 4xØ23 - 72 Prestressed concrete lintels 4xØ98 - 392 Concrete + steel + chemical anchor - 200 Sheet metal for the chimney 1 sheet -120 Wool - 300 Wool glue + mesh -120 Planitop mineral plaster -35 Membrane 3 x 300 -900 Battens 600m Counter battens 200m -2000 Chimney flashing 1 sheet + roofer's labor -320 Gutter strip - Gutters (all) - 1700 Ventilation starter strip 22 pcs. - 330 Tigra metal roof tiles 200 sheets -7000 Roofing flashings Roof window + EHV-AT flashing - 1700 XDP flashing - 100 Roof hatch -300 Windows x9 + installation -20,000 Soudal Hybrid + LQ membranes -413 Partition walls H+H block 12 cm 4 pallets 3000 Thin-bed mortar 15 bags 375 Woder XS x3 540 Electrical installation 4500 Plaster 220m2 2432 Plumbing installation 4900 Sewerage (pipes, elbows) 610 Window sills 930 EPS 100 underfloor polystyrene 5 cm x 31 packs of PLN 75 2325 8 cm x 20 packs of PLN 77 1540 Low-pressure foam 8x20 PLN 160 Underfloor heating + labor 9000 + 3000 Cement floor 4600 Sockets + switches 560 Heat recovery stage I 10800 Deep well 4500 Water connection to the house 3700 Excavator 400 EPDM membrane + adhesive 200 Marten mesh 200 Styrofoam + foam 650 OSB + screws 1100 UD30, CD60 mushroom hangers screws 1050 2 roof windows + installation 4000 Wool 7500 Attic ladders 1100 Vapor barrier film 450 Tapes and other foils 200 Attic plasterboards 30 pcs 900 Ground plasterboards 20 pcs 600 Screed and mesh 600 Boiler room 37,000 Viega frame 2x 790 Boiler boards and other installation accessories 200 Bathroom tiles (upper floor) 3,000 Bathtub 800 Adhesives, blocks, and other 1,000 Exterior doors Erkado 5,500 Bathtub + blocks and mortar 1,000 Grout 100 Panels 3,500 Old brick 750 Bathroom tiles 4,000 Other bathroom accessories 2,500 Glass tiles 4,500 Adhesive 500 TOTAL PLN 253,252