Building Simulation Best Practice: End of life HVAC replacement

In this best practice webinar IBPSA Fellow, PC Thomas, presents a case study on the 'end-of-life' replacement of air-conditioning plant in a 25+ year old building which resulted in a verified reduction in annual energy consumption of 46%. This case study demonstrates the potential for integrated engineering analysis, underpinned by whole building energy simulation to drive significant reductions in energy consumption for medium to large existing buildings.