Abnormal load shuts down Brighton
Parts of Sussex brought to a standstill as two 300+ tonne transformers for the National Grid make their way from Shoreham Port to Ninfield Power Station with a police escort. Transport was provided by Alleley's Heavy Haulage. This is the first time in the UK that two transformers have been moved at the same time.

▶︎
Abnormal Loads & Drivers At The Top Of Their Game - 12th June 2026

▶︎
Very heavy 706 tonne transport with 280 wheels squeezes through tight bend as police shut roads

▶︎
300-Tonnen-Transformator fährt durch Braunau am Inn

▶︎
70m 145 tonne lorry meets small Surrey roundabout.

▶︎
Train Loading Efficiency : Two Dozers, 11,000 Tons, 100 Cars

▶︎
Allelys Heavy Haulage Worksop 22 - 07 - 23

▶︎
Industrial Grade Oxygen Tank Abnormal Load Movement Collett & Sons Ltd 29/06/20 - TripleNineMedia

▶︎
Moving the Unmovable | Full Documentary on Heavy Haul Transport and Oversized Loads

▶︎
Heavy load specialists Allelys, transport a 184t transformer from Ipswich to Burwell. 6th June 2021

▶︎
A 70 metre, 140 Tonne Abnormal load making its way into New Haw, Surrey

▶︎
Super sized transport takes over Cheshire as police escort supergrid transformer

▶︎
Impressive 300 Tonne Lorry Convoy Arrives at Ninfield Substation East Sussex

▶︎
Large bridge sections take over road as police escort abnormal loads

▶︎
Convoi exceptionnel 360 tonnes

▶︎
Idiots with Fast Trucks: Heavy Equipment Fails | Extreme Oversized Truck Transport #25

▶︎
Largest load to transported out of GE Rugby! Allelys Heavy Haulage!

▶︎
Abnormal Loads 2 - Drivers and The Steersmen At The Top Of Their Game - Filmed on 15th June 2026

▶︎
Daher Logistik, Trafotransport - Mit 488 t durch die Nacht

▶︎
Groot transport transformator TenneT Wagenborg Onstwedderklap Nieuwe Pekela

▶︎
