Engineering in Standedge Tunnel
In this evenings video we are looking at an engineering project in the Standedge canal and disused railway tunnels. The Standedge canal and railway tunnels go back as far as 229 years. The canal tunnel is the deepest, highest and longest canal tunnel in the world. The engineering work is to renew a communication system for the canal tunnel so that canal boats can be tracked through the tunnel. Pleasure tours and private canal boats go through the Standedge canal tunnels. Thank you to the Canal & River trust for inviting us along and looking at what the civil engineering contractor has done in the tunnels. The Standedge tunnel goes under the Pennine hills between lancashire and Yorkshire between the villages of Diggle and Marsden.

▶︎
Standedge canal tunnel.The Longest, The deepest, The highest !

▶︎
The Wapping Railway Tunnel Liverpool

▶︎
Why German Engineers Couldn't Explain How Britain Built A Bomb That Bounced On Water

▶︎
Stockport and its disused railway history.

▶︎
Before Electricity, Windmills Worked Like This!

▶︎
Norway is Building The World's Deepest Mega-Tunnel

▶︎
Something is jamming GPS over Europe. Here's what we found

▶︎
German Pilot Tested A Captured Spitfire... His Words Shocked The Luftwaffe

▶︎
Collector Fails | Epic Flood as River and Rain Water Rush Into the Mine | Total Disaster

▶︎
The Tunnel that Collapsed. The Malton to Driffield Railway

▶︎
272. The deepest, highest, longest canal tunnel in Britain

▶︎
Five historical Gems around Manchester & Salford

▶︎
We Tested Plug-In Solar. The Industry Got This Wrong.

▶︎
Vintage railway film - Railway bridge across the Thames - 1968

▶︎
Why Roads Get Washboards

▶︎
New Hydro Turbine Crushes Previous Power Record.

▶︎
The Most Complex British Engine Ever

▶︎
How Did JCB Survive When Britain’s Heavy Machine Industry Collapsed?

▶︎
Inside the T-34-85

▶︎
