Airoli Katai Freeway BIG Update 😱 Parsik Tunnel Almost Ready | Phase 3 Work Finally Started

Airoli–Katai Freeway Mumbai Metropolitan Region ka ek major infrastructure project hai jo Navi Mumbai ko Kalyan-Dombivli se direct connect karega. Lagbhag 12.3 km lamba yeh 6-lane elevated freeway Airoli se Katai Naka tak banaya ja raha hai jisme 1.7 km lamba Parsik Hill twin tunnel bhi include hai. Is project ke complete hone ke baad Airoli se Kalyan-Dombivli ka travel time 45 minutes se ghatkar sirf 10-15 minutes reh jayega, jisse Shilphata Road par traffic congestion bhi kaafi kam hoga. Is video me hum dekhenge: • Airoli Elevated Road Progress • Thane Belapur Road Overbridge Update • 1.7 km Parsik Twin Tunnel Latest Status • NH48 ke paas Phase 2 Completion • Phase 3 Construction Start Near Padle Gaon & Kongaon • Current Progress vs Deadline Delay Project ki total cost lagbhag ₹2580 crore hai aur ise MMRDA develop kar raha hai. Agar aapko Mumbai Infra Projects, MMR Infrastructure Updates, Metro Projects aur Expressway Updates me interest hai to Infra Unfiltered channel ko zaroor subscribe karein. #AiroliKataiFreeway #MumbaiInfra #MMRDA #MumbaiInfrastructure #ParsikTunnel #KalyanDombivli #NaviMumbai #MumbaiProjects #InfraUpdate #MumbaiDevelopment #IndianInfrastructure #InfraUnfiltered Accept The Challenge by MaxKoMusic | https://maxkomusic.com/ Music promoted by https://www.chosic.com/free-music/all/ Creative Commons CC BY-SA 3.0 https://creativecommons.org/licenses/... Follow on Instagram for latest updates https://www.instagram.com/infraunfilt...

🚨 Airoli Katai Freeway BIG Update | Phase 1 Ready, Tunnel Near Completion & Phase 3 Progress 🔥
▶︎

🚨 Airoli Katai Freeway BIG Update | Phase 1 Ready, Tunnel Near Completion & Phase 3 Progress 🔥

3 Months Later! Thane–Bhiwandi Bypass Update | Massive Progress on Ulhas Bridge & Vadape ROB
▶︎

3 Months Later! Thane–Bhiwandi Bypass Update | Massive Progress on Ulhas Bridge & Vadape ROB

Do Bhai Khalifa malegaon wale 🌹9923093196🌹7276583035🌹9028545498🌹
▶︎

Do Bhai Khalifa malegaon wale 🌹9923093196🌹7276583035🌹9028545498🌹

Jaishankar’s Brutal Introduction to Western Media: Arrogance Destroyed.
▶︎

Jaishankar’s Brutal Introduction to Western Media: Arrogance Destroyed.

Airoli Katai Naka Freeway Latest Update March 2026 | Airoli Katai Tunnel Update 2026
▶︎

Airoli Katai Naka Freeway Latest Update March 2026 | Airoli Katai Tunnel Update 2026

CBD Belapur Flyover to Taloja Phase 2 Ghot Camp | Taloja Ghot Camp | Navi Mumbai Road Tour 2025 🚗
▶︎

CBD Belapur Flyover to Taloja Phase 2 Ghot Camp | Taloja Ghot Camp | Navi Mumbai Road Tour 2025 🚗

Unbelievable Train Moments Caught on Camera
▶︎

Unbelievable Train Moments Caught on Camera

Mumbai Coastal Road Drive | Marine Lines to Bandra 4K
▶︎

Mumbai Coastal Road Drive | Marine Lines to Bandra 4K

सिर्फ 20 मिनिट में ? नवी मुंबई से बदलापूर अब दूर नहीं ?
▶︎

सिर्फ 20 मिनिट में ? नवी मुंबई से बदलापूर अब दूर नहीं ?

Goregaon–Mulund Link Road FULL Update 2026 🚀 TBM Launch, 3-Level Interchange, Flyover Ready!
▶︎

Goregaon–Mulund Link Road FULL Update 2026 🚀 TBM Launch, 3-Level Interchange, Flyover Ready!

Airoli Katai Naka Freeway 6 line Project update | ऐरोली-कटाई नाका एलिवेटेड रोड (Freeway) Rs2580cr
▶︎

Airoli Katai Naka Freeway 6 line Project update | ऐरोली-कटाई नाका एलिवेटेड रोड (Freeway) Rs2580cr

Air India 171: What If It Wasn't the Pilot?
▶︎

Air India 171: What If It Wasn't the Pilot?

Airoli Katai Naka Freeway Progress | September 2025 | The Bridge Connecting Mumbai
▶︎

Airoli Katai Naka Freeway Progress | September 2025 | The Bridge Connecting Mumbai

Thane Coastal Road BIG Progress! Girder Launch Started 🔥 | 3 Month Ground Update
▶︎

Thane Coastal Road BIG Progress! Girder Launch Started 🔥 | 3 Month Ground Update

Badlapur: MMR’s Next Growth Story ? | Connectivity Boom ft. Ajay Thanekar
▶︎

Badlapur: MMR’s Next Growth Story ? | Connectivity Boom ft. Ajay Thanekar

Navi Mumbai Mega Projects Update 🔥 Taloja–Kharghar Link Road + Kharghar–Turbhe Tunnel Progress
▶︎

Navi Mumbai Mega Projects Update 🔥 Taloja–Kharghar Link Road + Kharghar–Turbhe Tunnel Progress

India’s Hidden Mega Projects Nobody Talks Abouts
▶︎

India’s Hidden Mega Projects Nobody Talks Abouts

Why Airoli - Kalwa Line the Most Important Railway Project in Mumbai 🛤
▶︎

Why Airoli - Kalwa Line the Most Important Railway Project in Mumbai 🛤

Mumbai to Alibaug Faster Route! Revas Karanja Bridge June 2026 Construction Update
▶︎

Mumbai to Alibaug Faster Route! Revas Karanja Bridge June 2026 Construction Update

NHSRCL | Bullet Train Track System
▶︎

NHSRCL | Bullet Train Track System