Eng. Joseph Murage: Reinforcement of 400kV Loiyangalani–Suswa Transmission Line 2025
KETRACO's Project Manager for the Grid Reinforcement Project, Eng. Joseph Murage, takes us through the reinforcement works on the 400kV Loiyangalani–Suswa Transmission Line at Longonot. The project enhances the reliability of power evacuation from the Lake Turkana Wind Power (LTWP) plant, reducing interruptions associated with the temporary bypass, and providing the Grid with N-1 contingency for greater stability. #KETRACO #LTWP #StableGrid #ReliablePowerTransmission #GreenEnergy #LoiyangalaniSuswa

▶︎
400/220kV Mariakani Substation: Stable and Reliable Electricity at the Coast

▶︎
Reinforcement of 400kV Loiyangalani–Suswa Transmission Line

▶︎
Simon Cowell Was Skeptical... Then She Left Him Speechless | BGT 2026

▶︎
#ExpandingtheGrid: Eng Eliud Chepkoech, Manager Substations, KETRACO

▶︎
#BehindTheGrid: Eng. Ruth Njuguna

▶︎
Commissioning of the 400/220kV Mariakani Substation by H.E President William Samoei Ruto, C.G.H.

▶︎
Police officer Lawrence Nyaga's long fight for justice and perennial transfers

▶︎
#BehindtheGrid: Birisha Raphael’s Journey

▶︎
Commissioning of The 132kV Sondu–Homa Bay Transmission Line Project

▶︎
Watch Ukrainian Drones OBLITERATE a Russian Jet

▶︎
Why a Somali World Cup referee was barred from the United States | The Global Story

▶︎
KENYA ELECTRICITY TRANSMISSON PPP PROJECT AGREEMENT SIGNING (15th Dec 2025)

▶︎
Iran and US agree deal to end war | BBC News

▶︎
Transforming Lives: Ronald Mwiwawi on the Impact of the 132kV Sondu–Homa Bay Transmission Line

▶︎
6 Mega Projects That Will Change Kenya Forever

▶︎
Elfenbeinküste – Ecuador Highlights | Gruppe E, FIFA WM 2026 | sportstudio

▶︎
Eng. Victor Oyaya| Mariakani Substation

▶︎
Scars from Russia: Former KDF pilot narrates his escape from Russia war, going for days without food

▶︎
How China Built an Impossible Bridge Above the Clouds

▶︎
