Bruno Escoffier (LIP6, Sorbonne) Resource Leveling for Scheduling Problems

Keywords: Scheduling, Resource leveling, Complexity, Approximation algorithms Scheduling problems usually consider resource constraints as hard constraints. In resource leveling instead, a function of resource use is optimized, typically under a deadline constraint. This is motivated by the fact that, in practice, additional resources (e.g., workforce or machines) can be mobilized in order to meet a deadline, yet at some cost. In this talk we will focus on the following setting: given a (target) resource level, our goal is to schedule the jobs in such a way as to best respect this resource level, that is to say, to exceed it as little as possible. We study classical scheduling problems (with or without precedence constraints, with arbitrary or unit processing times,...) in this setting, providing both positive and negative complexity and approximability results. Organized by Zdenek Hanzalek (CTU in Prague), Michael Pinedo (New York University), and Guohua Wan (Shanghai Jiao Tong). Seminar's webpage: https://schedulingseminar.com/

Tonguc Unluyurt (Sabanci University) A review of the sequential testing problem and its extensions
▶︎

Tonguc Unluyurt (Sabanci University) A review of the sequential testing problem and its extensions

6. Monte Carlo Simulation
▶︎

6. Monte Carlo Simulation

Alena Otto (TU Munich) Overcoming poor data quality
▶︎

Alena Otto (TU Munich) Overcoming poor data quality

Jin QI (Hong Kong UST) | Elective Surgery Sequencing and Scheduling Under Uncertainty
▶︎

Jin QI (Hong Kong UST) | Elective Surgery Sequencing and Scheduling Under Uncertainty

[Scheduling seminar] Pieter Smet (KU Leuven) | Robustness in personnel rostering
▶︎

[Scheduling seminar] Pieter Smet (KU Leuven) | Robustness in personnel rostering

The Professor Who Taught People How To Think (1962)
▶︎

The Professor Who Taught People How To Think (1962)

🔴 Makkah Live | مكة مباشر | الحرم المكي مباشر | قناة القران الكريم السعودية مباشر | مكه المكرمه
▶︎

🔴 Makkah Live | مكة مباشر | الحرم المكي مباشر | قناة القران الكريم السعودية مباشر | مكه المكرمه

We're 99.9% sure this pattern is true, but no one can prove it
▶︎

We're 99.9% sure this pattern is true, but no one can prove it

God Says:"I WANT YOU TO KNOW THIS — OPEN IT TONIGHT"/God Message Now/God Message
▶︎

God Says:"I WANT YOU TO KNOW THIS — OPEN IT TONIGHT"/God Message Now/God Message

How AI Cracked the Protein Folding Code and Won a Nobel Prize
▶︎

How AI Cracked the Protein Folding Code and Won a Nobel Prize

[Scheduling Seminar] Petr Vilim (OptalCP) and Vilem Heinz (CTU in Prague)  OptalCP
▶︎

[Scheduling Seminar] Petr Vilim (OptalCP) and Vilem Heinz (CTU in Prague) OptalCP

[Scheduling seminar] Hoogeveen, J.A. (Utrecht Uni)  | Planning shunting operations at railway hubs
▶︎

[Scheduling seminar] Hoogeveen, J.A. (Utrecht Uni) | Planning shunting operations at railway hubs

China’s Secret | The Most Unbelievable Megaprojects in China | 4K Travel Documentary
▶︎

China’s Secret | The Most Unbelievable Megaprojects in China | 4K Travel Documentary

God Says:"I JUST CONFIRMED — ONLY YOU CAN SEE THIS LETTER"/God Message Now/God Message
▶︎

God Says:"I JUST CONFIRMED — ONLY YOU CAN SEE THIS LETTER"/God Message Now/God Message

How to Learn Python | Python Programming | Learn Python | Intellipaat
▶︎

How to Learn Python | Python Programming | Learn Python | Intellipaat

What do tech pioneers think about the AI revolution? - The Engineers, BBC World Service
▶︎

What do tech pioneers think about the AI revolution? - The Engineers, BBC World Service

How ASML Makes Chips Faster With Its New $400 Million High NA Machine
▶︎

How ASML Makes Chips Faster With Its New $400 Million High NA Machine

[Scheduling seminar] Přemysl Šůcha (CTU in Prague) | Machine Learning Inside Decomposition
▶︎

[Scheduling seminar] Přemysl Šůcha (CTU in Prague) | Machine Learning Inside Decomposition

[Scheduling Seminar] Laurent Houssin (ENAC, UT) Flow-shop and job-shop robust scheduling problems
▶︎

[Scheduling Seminar] Laurent Houssin (ENAC, UT) Flow-shop and job-shop robust scheduling problems

Shade Tree Used Car Lot Strikes AGAIN! (Customer JUST BOUGHT this CAR) 2007 Kia Optima 2.4
▶︎

Shade Tree Used Car Lot Strikes AGAIN! (Customer JUST BOUGHT this CAR) 2007 Kia Optima 2.4