Tales from the Layout - Adding Levels and Laying Track in the Helix
This is the second part of building my first helix for my HO Scale Layout. The levels (tiers), bracing, track and feeder wires are added. Testing with a locomotive and rolling stock are conducted as the helix is built. This helix is roughly a 3% grade. If you have any suggestions or recommendations, please feel free to leave them below in the comment section. Enjoy and Thanks for Watching!

▶︎
Helix construction, part 1: Roadbed

▶︎
Constructing the Large Helix for the Sayrehurst Secondary

▶︎
Incredible Moments Caught on Camera !

▶︎
The Most Satisfying Machines That Are At Another Level!

▶︎
Helix Construction on the Lucaston & Southern - Model Railroading

▶︎
Moments You Must See To Believe | Incredible Moments #10

▶︎
Second Helix Model Railway Build - Part 1 - The Escarpment

▶︎
Insane Aviation & Sky Fails Caught on Camera

▶︎
Helix construction for the Sayrehurst Secondary

▶︎
Building a Helix at Chadwick Model Railway | 114.

▶︎
Helix construction part 4

▶︎
The Big Helix: Installing The Roadbed (255)

▶︎
When Animals Surprise Photographers in the SWEETEST Way! 😍

▶︎
Dangerous Pakistani Factory Works FORGING the World’s Largest Industrial Gear | Full Process

▶︎
CCMR Train Talk #1: Four Small Layout Features That Work

▶︎
working on the helix using the best tool ever, a track gauge

▶︎
Boat Ramp DISASTERS Caught On Camera !

▶︎
Model Railroad Demolition - Bye Bye Helix

▶︎
Steve's Workshop: Laying Down Roadbed

▶︎
