UNIT RATE FOR REINFORCEMENT/ESTIMATION AND COSTING BUILDING WORKS

Join this channel to get access to perks:    / @easyqs   Don't click this link    / @easyqs   Kindly join our community by subscribing to our channel and clicking on the notification bell to get notified of our upcoming videos and to benefit from our upcoming offers.Joining our channel with the link above will enable you get certain privileges as listed there in.Here we shall sharpen your skills on estimation and costing building works to be the best quantity surveyor there can ever been. This video will help you get a clear picture on your mind about what take off really involves.This is the first step when preparing a bill of quantities.If you like this content please subscribe. Check out related videos;-    • Stop! 5 Essential Checks Before Measuring ...   Take-off for substructure works    • THE EASIEST TAKING OFF  SUB-STRUCTURE WORK...   Clear example of substructure take-off    • WHO IS A QUANTITY SURVEYOR??  WHAT IS HIS ...   Roles of a quantity surveyor in a construction project    • Types of sums found  in a bill of quantiti...   Types of sums found in a bill of quantities    • INTRODUCTION TO TAKING OFF SUPER-STRUCTURE...   INTRODUCTION TO SUPER-STRUCTURE TAKE OFF    • Taking off super-structure works   EXAMPLE 1 TAKING OFF SUPERSTRUCTURE WORKS    • TAKING OFF SUPER-STRUCTURE WORKS EXAMPLE 2   EXAMPLE 2 TAKING OFF SUPERSTRUCTURE WORKS    • HOW TO MEASURE SUBSTRUCTURE WORKS FOR A BU...   TAKING OFF SUBSTRUCTURE WORKS WITH SEMI-CIRCLE    • Taking Off Quantities For External Works U...   Taking Off Quantities For External Works Using CESMM (Driveways, Parking ,Landscaping $ Fencing )    • How To Take -Off Quantities For Gable Roof...   How To Take -Off Quantities For Gable Roof    • Taking Off Quantities for  Hipped Roof (Si...   Taking Off Quantities for Simple Hipped Roof    • HOW TO TAKE OFF STAIRCASE WORKS; FORM-WORK...   HOW TO TAKE OFF STAIRCASE WORKS; FORM-WORK,CONCRETE,REINFORCEMENT,BALUSTRADE $ FINISHES (FULL VIDEO)    • Rate Analysis  for Terrazo  finish per squ...   How to calculate unit rate for finishes per square meter (terrazo finish)    • HOW TO TAKE-OFF A SQUARE UNDERGROUND WATER...   Taking Off a Square Underground Water Tank (Basement)    • Taking –off substructure works with Thickn...   Taking –off substructure works with Thicknessing    • THE SECRET OF TAKING OFF FOUNDATION OF A R...   Taking –off substructure works with columns    • How to calculate Centreline - Simple  Shap...   Centreline Method -Calculating Centreline - Regular Shapes And With Recess At The Corner(Lecture 1)    • CENTER LINE FOR IRREGULAR FLOOR PLANS   CENTER LINE FOR IRREGULAR FLOOR PLANS    • Measurement of (Taking Off) Staircase Work...   Measurement of (Taking Off) Staircase Works Example 2    • Full Take Off For A Small Bungalow.(Substr...   Taking off Substructure with external cavity wall and internal block wall.

Calculating the rate of doing Mazera tiles on roofing per square meter PART 2
▶︎

Calculating the rate of doing Mazera tiles on roofing per square meter PART 2

How to Calculate Concrete Unit Rate Step-by-Step | Easy QS for Builders & Students
▶︎

How to Calculate Concrete Unit Rate Step-by-Step | Easy QS for Builders & Students

How to measure Site clearance,Removal of veg.soil,Reducing the level and Trench excavation.Part 1
▶︎

How to measure Site clearance,Removal of veg.soil,Reducing the level and Trench excavation.Part 1

How to Derive Productivity Rates in Construction
▶︎

How to Derive Productivity Rates in Construction

Understanding Rate Build-Up for Construction Projects | Step-by-Step Guide
▶︎

Understanding Rate Build-Up for Construction Projects | Step-by-Step Guide

How Much Does It Cost to Build 1m²? | Understanding Unit Rates + BOQ Basics
▶︎

How Much Does It Cost to Build 1m²? | Understanding Unit Rates + BOQ Basics

Amount of  Cement and Sand needed during Plastering Walls/Estimation and Costing Building Materials
▶︎

Amount of Cement and Sand needed during Plastering Walls/Estimation and Costing Building Materials

HOW TO BUILD UP RATE FOR 150MM (6 INCH) BLOCKWORK | DETAILED CONSTRUCTION ESTIMATION GUIDE
▶︎

HOW TO BUILD UP RATE FOR 150MM (6 INCH) BLOCKWORK | DETAILED CONSTRUCTION ESTIMATION GUIDE

Rate analysis for unit cost of wooden  formwork
▶︎

Rate analysis for unit cost of wooden formwork

How to Calculate Cement, Sand and Aggregates In Concrete Slab | Easy Step-by-Step Quantity Calcs
▶︎

How to Calculate Cement, Sand and Aggregates In Concrete Slab | Easy Step-by-Step Quantity Calcs

Approximate Estimation Methods /Functional Unit Method /Examples/ESTIMATION AND COSTING BUILDINGS
▶︎

Approximate Estimation Methods /Functional Unit Method /Examples/ESTIMATION AND COSTING BUILDINGS

Earthwork Calculations For Road Works | How to Calculate Earthwork Cutting and Filling Quantity
▶︎

Earthwork Calculations For Road Works | How to Calculate Earthwork Cutting and Filling Quantity

BUILD UP A UNIT RATE FOR BASEMENT EXCAVATION WORKS IN COSTING AND ESTIMATION
▶︎

BUILD UP A UNIT RATE FOR BASEMENT EXCAVATION WORKS IN COSTING AND ESTIMATION

You have to be FINANCIALLY SELFISH to succeed. Attic Session By Benard Odote.
▶︎

You have to be FINANCIALLY SELFISH to succeed. Attic Session By Benard Odote.

Why Ksh 1M only gets you this (3 bedroom house)
▶︎

Why Ksh 1M only gets you this (3 bedroom house)

TAKING OFF RETAINING WALL USING NRM2   /BILL OF QUANTITIES TUTORIALS
▶︎

TAKING OFF RETAINING WALL USING NRM2 /BILL OF QUANTITIES TUTORIALS

Build up unit rate for walls
▶︎

Build up unit rate for walls

Step-by-Step Mortar Cost Calculation for 1 Cubic Meter
▶︎

Step-by-Step Mortar Cost Calculation for 1 Cubic Meter

How does a steel bracing works structurally?
▶︎

How does a steel bracing works structurally?

Build Up Unit Rate For BRC Mesh Laying| Unit cost #estimation
▶︎

Build Up Unit Rate For BRC Mesh Laying| Unit cost #estimation