Gleisbauzug in Aktion - Remsbahn Waiblingen - Grunbach
On the weekend 13th and 14th April 2019 the tracks were exchanged between Waiblingen and Grunbach, Germany. A track renewal train from the company Wiebe, which replaced atomatically the old sleepers and tracks with new ones during the run, was used.

▶︎
P 95 MATISA / ETF

▶︎
So viel Gelb ist selten auf der Bahnstrecke PM 1000 URM + RU 800 S | Plasser & Theurer

▶︎
Erneuerung BÜ Hauptstraße in Emmerthal

▶︎
50 Impressive Agriculture Machines Operating at Peak Efficiency

▶︎
CB schaut Züge - Baustellen-Spezial - Teil 3 Gleisumbauzug MATISA P95 im Einsatz

▶︎
DB 232 241-0 mit Notfallkranzug am 07.06.26 in Bautzen

▶︎
Big Loader Filling Dumper with Stones

▶︎
Complete Railway Maintenance | Heavy Machines, Rail Cutting, Welding & Track Technology

▶︎
24 Stunden auf dem Güterbahnhof | Die Nordreportage | NDR Doku

▶︎
Flüssiges Roheisen auf der Eisenbahn - Torpedopfannen an der Saar

▶︎
Unbelievable Train Moments Caught on Camera

▶︎
Gleiserneuerung Emmerthal

▶︎
TCM 60 MATISA / MECCOLI

▶︎
MATISA P 95 | STRUKTON

▶︎
Капитальный ремонт УЖД в Лавассааре часть 2 / Narrow gauge track repair at Lavassaare museum part 2

▶︎
Automatic Reconstuiction of a track

▶︎
Worlds largest track layer in 2011 - Plasser & Theurer SVM1000 Infranord at Haparandabanan, Sweden

▶︎
Gleisbaumaschinen im Großeinsatz

▶︎
Railway Track Laying Machine renewing a high-speed railway line

▶︎
