3D animation TBM S574 "Martina" (eng)
Showing how the huge EPBM S574 "Martina" works. Excavation diameter: 15.62 m (equivalent to a five-storey building) Overall length: 130 m Excavation area: 192 m2 Thrust: 39,485 T Total weight: 4500 T Total installed power: 18 MW Annual energy consumption: approx. 62,000,000 kWh For further information: http://www.totospa.it/

▶︎
Eppenberg SBB Railway Tunnel - From installation to the breakthrough

▶︎
Large Diameter EPB Shield

▶︎
Tunnel Boring Machine (TBM) Explained - 3D Animation

▶︎
Gripper TBM

▶︎
Before Electricity, Windmills Worked Like This!

▶︎
Tunnel Boring Machine (TBM) Explained - 3D Animation

▶︎
How Massive Aircraft Engines Are Mass Produced Inside Complex Assembly Factory

▶︎
Ritom Pumped-Storage Plant Project – Tunneling under extreme conditions

▶︎
Durchschlag am Kaiser-Wilhelm-Tunnel in Cochem auf nkwt.de

▶︎
World record TBM Martina

▶︎
Why Submarines STOPPED Firing Torpedoes From The Nose

▶︎
Channel Tunnel | The Mind-blowing Engineering Behind It

▶︎
Axpo Projekt Linthal 2015 - Nexans 380kV Kabelanlage PSW Limmern - UW Tierfehd

▶︎
Belchentunnel (Schweiz) – Projektfilm

▶︎
TERRATEC Tunnel Boring Machine - EPB Series

▶︎
Double Shield TBM

▶︎
Robbins Earth Pressure Balance Machines (EPBs)

▶︎
Double Shield TBM animation

▶︎
Rototraslazione TBM "Martina" U-turn

▶︎
