Christmas Project Reno Week 3 - Mistakes Were Made

Welcome to Week 3 of my Christmas dollhouse renovation project! This week was all about wrapping up the exterior, and wow- everything is finally starting to come together. The trim is now painted black, and the windows and doors have been stained a rich dark walnut that somehow feels both vintage and new at the same time. I did hit a few bumps along the way… specifically the pavers by the front door, which I repainted not once, not twice, but three times. Is it even a renovation if you aren’t forced to redo something at least once? With the exterior mostly complete, all that’s left are the finishing touches: building a new step for the side door, installing the music box inside the roof, and decking out the entire outside for Christmas. Here’s hoping I can get it all done next week! Chapters: 0:00 Intro 2:08 Painting Trim 7:34 Adding Trim 9:17 Painting the Roof 9:43 Finishing the Trim 10:52 Window and Door Prep 12:55 Window and Door Stain 14:21 Removing the Rocks 14:56 Painting the Pavers 18:09 Reassembly 19:25 Weekly Wrap-Up Links: FB:   / viva-design-miniatures-61557384457688   IG:   / vivadesignminiatures   TT:   / vivadesignminiatures   LinkTree: https://linktr.ee/vivadesignminiatures Amazon Storefront: https://www.amazon.com/shop/vivadesig...