We're So Close… But This Extension Has to Be Finished First
This week the focus is on the final extension as we work to bring Plot 3 up to the same stage as the other cottages. The team are building the blockwork up to joist height so the carpenters can return next week to install the floor joists and keep the extension moving. Once the roof is on, every plot will finally be in the dry. Meanwhile, inside the first two cottages, things are moving quickly. Decorating is well underway, luxury herringbone flooring has been laid, plastering is complete, and we're getting ever closer to kitchen installation. The finish line is getting closer, but first we need to get this last extension caught up.

▶︎
Building a £130k Kitchen Extension for £55,000 (Satisfying ASMR Timelapes)

▶︎
Attempting to build a loft conversion when everything is measured wrong

▶︎
THE TRICKIEST PLASTERING JOB EVER! angles galore

▶︎
We bought a Grand Stone House in Portugal: 2.5 years progess in 30 minutes/ No Talk

▶︎
Full House Extension Build. Start to Finish Timelapse | Open-Plan Kitchen (UK)

▶︎
We Finally Uncovered Our Underground Reservoir

▶︎
Inside James May's home workshop

▶︎
A library comes together.

▶︎
The Professional Idiots' Ruined Barn… Here’s EXACTLY what I’d Build

▶︎
American Reacts to How German Houses are Built! *INSANE*

▶︎
THREE YEARS renovating 150 Year Old FRENCH FARM HOUSE - 3 Finished Kids Rooms - Timelapse

▶︎
Rebuilding Off-Grid Tiny House (START of Roof)

▶︎
Roof Framing – Rafters & Bargeboards | Tiny Barn Build (Pt 18)

▶︎
Man Builds A 500-Meter Stone Wall Over 1 Year (Final Episode) | Result and Thoughts

▶︎
6 MONTHS Renovating a Stone House in the South of Spain

▶︎
A WEIRD WINDOW WITH NO GLASS IN ???

▶︎
I bought an ABANDONED mansion | renovation timelapse

▶︎
He saved this OLD OAK BEAM... Here's Why / Renovating a 110+ y.o. ABANDONED farm in Belgium

▶︎
£40,000 Contractor vs. Me Solo: Building a Luxury Garden Studio

▶︎
