Big day on the big-dawg, and my hopper was COOKED!!!
Pumping an elevated concrete with our Putzmeister 58Z concrete pump on one of the hottest days of 2023.

▶︎
INSANE High Rise CONCRETE POUR!!!

▶︎
First Pour with a BRAND NEW PUTZMEISTER Concrete Pump!!!

▶︎
【#fireworksmania 】最後の花火 #古家柚香

▶︎
The Sketchiest Project I Ever Attempted. (No Water or Sewer for 4 Days)

▶︎
12 Hour Milling Job… Because of THIS (Cemetery Work)

▶︎
Moments Filmed Seconds Before Disasters | Incredible Moments Caught on Camera | Best of the Month

▶︎
20 Minutes of Satisfying Factory Machines, Ingenious Tools & Skilled Workers▶ 9

▶︎
When concrete goes FULL NUCLEAR!!!

▶︎
Heavy Machinery At Another Level | Extreme Logging Operations

▶︎
FULL MEGA-MANSION BUILD | Construction ASMR | KBUILD Series

▶︎
Pumping 2000+ cubic yards of concrete for a 50 story high-rise:

▶︎
Dangerous Fastest Idiots Cutting Tree Fails Skill With Chainsaw | Tree Falling on Houses #17

▶︎
Pouring on a crazy hill

▶︎
The Entire History of Caterpillar Inc.

▶︎
Inside the World’s Craziest Job: Aerial Power Line Work!

▶︎
House Demolition, Maple Ridge

▶︎
Satisfying Machines Operating at an INSANE Level ▶ 1

▶︎
Boom Pumping an Architectural Concrete Wall with the Sany 32ZZ from a TIGHT SETUP area!!!

▶︎
Before Electricity: How a Traditional Windmill Works – Part 2 | Turning Grain into Flour

▶︎
