HS2 Curzon Street Station Birmingham | Unseen 4K Up-Close Drone Footage of Giant 58-Tonne U-Beams

HS2 Curzon Street Station Birmingham 🚆 Huge U-Beam 4K Drone Inspection Up-Close 🏗️ - The Huge Horizontal Beams – Up To 34 Metres Long And Weighing As Much As 58 Tonnes – Will Support The Seven Platforms Being Built At Curzon Street Station. Each One Of The Reinforced Concrete Beams Is Being Precast Off-Site Before Being Moved Into Position In A Meticulously Planned Engineering Operation. 4K Epic Drone Flight Including An Amalgam Of Super Close-Ups & Huge Wide Panoramic Shots, Giving You, The Viewer, A Better Overall Dynamic Perspective Of The Enormous Scale, Precision & Engineering Complexity Of The HS2 Project - Now Using The New DJI Mini 5 Pro Drone. If You Follow The HS2 Project, Major UK Infrastructure, Or Live Locally, This Is Simply A Must-Watch! 👍🏻 As Always, Thanks For Watching. 👀 Please Hype The Video And Give It A Like. 👍🏻 Hit The Subscribe Button. 🔁 It Genuinely Helps The Channel Grow And Allows Us To Continue Documenting HS2 Infrastructure From The Air. 🙏🏻 Best Watched On The Big Screen In 4K For The Ultimate Cinematic Viewing Experience. More HS2 Construction Drone Videos From JMPS MEDIA Here:    • HS2 Construction UK      • HS2 Birmingham UK      • HS2 Warwickshire & West Mids UK   #hs2 #construction #drone #train #infrastructure