The Proper Selection of a Distribution Substation Transformer
QUESTION: Assume that one distribution transformer of a substation supplies three primary feeders. The 30-min annual maximum demands per feeder are listed in the table, together with the power factor (PF) at the time of annual peak demand. See Table in Video Assume a diversity factor of 1.15 among the three feeders for both real power (P). a)Calculate the 30-min annual maximum demand on the substation transformer in KW and KVA. b)Find the load diversity LD in KW. c)Select a suitable substation transformer size if zero load growth is expected and if the company permits as much as 25% short-time overloads on the distribution side of substation transformers. Among the standard three-phase transformer sizes, those available are: See List in Video d)Now assume that the substation load will increase at a constant percentage rate per year and will double in 10 years. If the 7500/9375 KVA - rated transformer is installed, in how many years will it be loaded to its fans-on rating? #SubstationTransformers #LoadGrowth #DiversifiedDemand To contact me send message to my WhatsApp: +55 32 999 163 417 Para entrar em contato comigo envie mensagem para meu WhatsApp: +55 32 999 163 417

CALCULATION OF VOLTAGES AND CURRENTS IN ELECTRICAL CIRCUITS

POWER CALCULATION - 14 EXAM QUESTIONS

The World's Most Important Machine

Is the AfD a threat to Germany? Mehdi Hasan & Maximilian Krah | Head to Head

FUNÇÃO INVERSA - 9 QUESTÕES DE CONCURSO

The Most Confusing Part of the Power Grid

You Know This Song (but the Orchestra Doesn’t) | Jacob Collier & VSO School of Music Orchestra | TED

Instrumental Worship Guitar : Best Worship Song | Peaceful, Relaxing Instrumental Hymns on Guitar

How Laplace Solved The Gaussian Integral!

Trump Sends Vance to Concede to Iran & Reflecting Pool Is Filled with Corruption | The Daily Show

Billionaire's WARNING: I'm SELLING. The Crash Is Already Here!

The Ridiculous Engineering of Jet Engines

Semiconductors explained in 16 mins | Chris Miller

Turing Award Winner: Disagreeing with Google, Postgres, Future Problems | Mike Stonebraker

Model Train Making Process. A 73-year-old Japanese artisan crafting model trains for decades.

How AI Is Pushing the Semiconductor Supply Chain to the Limit | Bloomberg Primer

40-50% Market Crash Coming: ‘Big Money Already Starting to Dump’ | Gareth Soloway & Michelle Makori

The 7 Levels of Watch Movements (And Why Most Collectors Get It Wrong)

Apollo Core Rope Memory (Apollo Guidance Computer Part 30)

