PVE 300PD Pile driving rig timelapse

Recently introduced PVE 300PD pile driving rig. This 280 ton machine has a 54 meter leader which is build to be used with a PVE 14/16NL hydraulic impact hammer and 40 meter casing. It's first project will be a large harbour project where it will be used to install 40 meter (Ø 1.625mm) casings for a combiwall. PVE managed to build this rig in 6 months from start to certification.